Laserfiche WebLink
8. a. Dneribe the method Mat will be utailor Inert t q tank s): <br /> r i br •Tc 1.. E�Art <br /> b. Tank/Piping Hauler. <br /> NamesTc ,f ', z 1J` ` Vi Gal- <-7QT7,flcJcJ <br /> Address x10 .1��x' .S CityilTticr!Z t zip <br /> Phone No.( . 0 <br /> Hauler Registration (U hauled as hazardous) <br /> C. 68n g Isposal Site: <br /> NameC% WC -s T, 16c <br /> Address �?�/O �C�c _([)r c scw� c^L1 cl a�c� zip-`�s`�d' <br /> Phone No.( �—V G ) �� <br /> EPA EM (if transported to a permitted TSD facility) <br /> 9. Descrlbe, in detail, how the soil and/or water sample(s) beneath the tank and piping will be obtained: <br /> 10. Describe how theexcavation will be backfilled with suitable material upon removal: <br /> IL Handling or excavated soil: <br /> a) What <br /> �material will be used to Rae the tank pit and cover the stockpile? <br /> b) What will be the final destination of the excavated stockpile? <br /> c) Contaminated Soil HazardousWasteHauler <br /> Name .l�l�e � ti "{ y� Hauler Registration # CP <br /> Address vrl-) City _Zip <br /> Phone No. (570 <br /> Page 5 <br />