Laserfiche WebLink
NIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VL UNDER DISPENSER CONTAINMENT UDC MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490.50 <br /> 490.64b <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING 02.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS ❑99.OTHER <br /> PANEL MANUFACTURER: 49°-99 MODEL#: 491-56. <br /> LEAK SENSOR MANUFACTURER: Mechanical 49F6] MODEL#(S): 490.51 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS N a.YES ❑b.NO 490-39 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN N a.YES ❑b.NO 490.60 <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SI IUTDOWN. N n.YES ❑b.NO 490.61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. N a.YES ❑b.NO 490.62 <br /> 2.UDC CONSTRUCTION IS ® 1.SINGLE-WALLED ❑ 2.DOUBLE-WALLED 490-68 <br /> IF DOUBLE WALLED: <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: El 1.LIQUID 0 2_PRESSURE 03_VACUUM________ _ <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 490-696 <br /> VII.PERIODIC SYSTEM TESTING <br /> El L ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY 'rHE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 4-6 <br /> LEAK DETECTIONfEI.D)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.(23 CCR✓f26444 _ <br /> ®2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 49°66 <br /> 3.SPILL BUCKET'S ARE TESTED ANNUALLY. 490.67 <br /> VIII.RECORDKEEPING <br /> Tire following monitcring/maintenance records are kept for this facility: <br /> N Alarm logs 44081. ❑Visual Inspection Records 49a68b ❑Tank integrity testing results 490-6a. <br /> ❑SIR testing results(and supporting documentation records). 49MU ❑ Tank gauging results(and supporting documentation records). 490--6e. <br /> ❑ATG Testing results(and supporting documentation records).4mur ❑ Corrosion Protection 60-day logs 490-688 <br /> N Equipment maintenance and calibration retards. 44o6eu <br /> IX.TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to lheirjob duties. 490694 <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> N THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)4906% <br /> N OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)49"% <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS4WM <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490.69. <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"491-690 <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490698 <br /> ❑ OTHER S eci :m69n,m6w <br /> N This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> D The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> D The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> D Names of contact persoMs)for emergencies and monitoring alarms.4L70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.4W71 <br /> Flapper Valve _ <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> Oris plan occurs,2)all cundilions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME Service Contact Center 990-72 TITLE 24 Hours 49073 <br /> NAME Rudy Tover 49x74 TITLE Market Manager 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report in the oww/operator,and inform The owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNERIOPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is Ime and accurate to the best of my knowledge. <br /> APJILICANISIGNyTURE 490-76 DATE: °90-77 <br /> I � 1w Caw Lc �� P,;bVSr 13 2.»9 <br /> APPLICANT NAME(print): 4W72 APPLICANT TITLE: 490-79 <br /> Rex T.Abacan Environmental Compliance Manager for <br /> Circle K Stores Inc. <br /> UPCF UST-D(12/2007)2/48 <br />