My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
2300 - Underground Storage Tank Program
>
PR0231532
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2022 2:28:59 PM
Creation date
11/2/2018 3:58:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231532
PE
2351
FACILITY_ID
FA0000185
FACILITY_NAME
CITY FOOD & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
03
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CAMBRIDGE\16470\PR0231532\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
10/23/2012 8:00:00 AM
QuestysRecordID
132740
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN-PAGE 1 (One form per facility) <br /> am <br /> TYPE OF ACTION ❑ I.NEW PLAN N 2.CHANGE OF INFORMATION <br /> I. FACILITY INFORMATION <br /> FACILITY ID g (Agenc),Use Only) — — <br /> BUSINESS NAME(Same OR FACILITY NAME) R0s <br /> Circle K Store 42701205 <br /> BUSINESS SITE ADDRESS R03 I CITY Roo <br /> 16470 Cambridge Street Lathrop <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc)wad,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> D Any release to secmadary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> D Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material may be reused until it becomes loo <br /> saturated to be effective. It will then be managed properly.Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container. <br /> Facility personnel will determine whether or not any water removed from secondary containment systems,or from clean-tip activity,has been in contact with any <br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste. If the water has a petroleum sheen (i.e., rainbow colors), it is <br /> contaminated. A thick Boating petroleum layer may not necessarily display rainbow colors. Water(hazardous or non-hazardous)Fran sumps,spill containers,etc. <br /> will not be disposed to stoma water systems. <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions occor- <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage trona any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to Ireat or neutralize <br /> released productlwaste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,and supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SffE,BUT AVAILABLE.FOR USE IF NEEDED: (Complete only it-applicable) <br /> EQUIPMENT LOCATION 11 AVAILABILITY <br /> RIO Rua UO <br /> R11. Mi. R11. <br /> R12, R22. R32. <br /> R13. R21. Un <br /> R14. R29. R34 <br /> R15. R2S. a35 <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTFIORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME R40 TITLE R50 <br /> Service Contact Center 24 Hours <br /> NAME R41. TITLE 1151 <br /> Rex T.Abacan Environmental Compliance Manager for <br /> Circle K Stores Inc. <br /> NAME R42. TITLE asz <br /> NAME R43. TITLE w <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> []Additional system testing or data collection Nlnspection by qualified persons ❑Recalibration of equipment <br /> Other:Tesler or Designated Operator Rha <br />
The URL can be used to link to this page
Your browser does not support the video tag.