My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
2300 - Underground Storage Tank Program
>
PR0231532
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2022 2:28:59 PM
Creation date
11/2/2018 3:58:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231532
PE
2351
FACILITY_ID
FA0000185
FACILITY_NAME
CITY FOOD & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
03
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CAMBRIDGE\16470\PR0231532\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
10/23/2012 8:00:00 AM
QuestysRecordID
132740
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U`*N,.KIED PROGRAM CONSOLIDATED FORM .ws <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Page I of 2) <br /> TYPE OF ACTION ❑ L NEW PLAN ® 2.CHANGE OF INFORMATION 490.1 <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 4W2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S) <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Un Only) <br /> BUSINESS NAME(Some as FACILITY NAME) Circle K Store #2701205 x <br /> BUSINESS SITE ADDRESS 16470 Cambridge.Street 101' CITY Lathrop 1°9 <br /> n.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors, probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers' instructions,or annually,whichever is more frequent,and that such work mast be performed by qualified personnel. <br /> 3 CCR§2632,2634 2638,2641Z_-------_________ _________ _ _ _-__.. <br /> MONITORING EQUIPMENT IS SERVICED ® L ANNUALLY ❑ 99,OTHER(Specify): 490-36 <br /> 490-x9 <br /> M.MONITORING LOCATIONS <br /> E L NEW SITE PLOT PLAN/MAP SUBMITTED WITH THUS PLAN. ❑2.SITE PLOT PLANIMAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)490-4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> JR I.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490.5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ❑ e.DRY E b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490-6 <br /> PANEL MANUFACTURER: Veeder Root _ 090.1 MODEL#: TLS-350 4902 <br /> LEAK SENSOR MANUFACTURER: Veeder Root 9909 MODEL#(S): 794380-303 °90-10 <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490.11 <br /> PANEL MANUFACTURER: 490-12. MODEL#: -_ _ -_ 4W <br /> IN-TANK PROBE MANUFACTURER: 49014. _MODEL#(S): _ a9a-1s <br /> LEAK TEST FREQUENCY:` ❑ 0.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY +9616 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): _ _ -__ 490.11 <br /> PROGRAMMED TESTS: ❑ e.0.3 g.p.h. ❑ h.0.2 g.p.h. ❑ c.OTHER(Specify): 4W19- <br /> 49619 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 4WD <br /> 490-x2 <br /> El 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490.24 <br /> TESTPREQUENCY: [Ia.ANNUALLY E] b.BIENNIALLY Elc.c.OTHER(Specify): 4xs <br /> 190.24 <br /> ❑99.OTHER (Specify): 490.27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENTWITH AUDIBLE AND 0_02s <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:Ea.DRY [3b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM ,90..x9 <br /> i'9o:io490.31 <br /> PANEL MANUFACTURER: Veeder Root MODEL#: TLS-350 <br /> LEAK SENSOR MANUFACTURER: Veeder Root _ 490.32 MODEL#(s)_ 794380-208990'x3 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ®e.YES ❑It.NO 490'34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. E e.YES ❑b.NO 490.35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTE_D123 CCR2¢ 636) IW36 <br /> MLLD MANUFACfURERM:Regular-FE Petro/Premium-Red Jacket ;900. MODEL#(S):Reg.#MLD/Prem.#FXtV 490.32 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 49x39 <br /> ELLD MANUFACTURER(S) <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 gF.h. 990'4' <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑It.NO 49w3 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑b.NO 49044 <br /> 4.PIPE INTEGRITY TESTING 49642 <br /> TEST FRE UENCY ❑ &ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 4w-4649nA? <br /> 5,VISUAL PIPE MONITORING. w0.49 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED' 49049 <br /> •Allowed Nr nwnimri 0f9n6uriM arae airc iwrnor fuel i in oni r HSC x528 L5 6 <br /> ❑ 6.SUCTION PIPING MEti 1'S EXEMPTION CRITERIA 123 CCR§2636(a)(3)1. 49o-50 <br /> El 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.1 IS CONNECTED TO THE TANI(SYSTEM <br /> 490-St <br /> 49D-Sx <br /> ❑ 99.OTHER(Specify) 490-sx <br />
The URL can be used to link to this page
Your browser does not support the video tag.