My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
2300 - Underground Storage Tank Program
>
PR0231532
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2022 2:28:59 PM
Creation date
11/2/2018 3:58:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231532
PE
2351
FACILITY_ID
FA0000185
FACILITY_NAME
CITY FOOD & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
03
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CAMBRIDGE\16470\PR0231532\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
10/23/2012 8:00:00 AM
QuestysRecordID
132740
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7777 <br /> JAN-15-9t3 70 =44 FROM=TOSCO ENVIRONMENTAL <br /> P p <br /> dr, <br /> -rasco UndMronnd Sto al a Tank <br /> Monitoxin¢ 'rr,__ n am <br /> Written Monitoring Procedure <br /> I Site Name: Circle K Stores Liar,Swe#I205 <br /> 2.Site Address and Phone number- 16744 Cambudge Latluop,CA 95330 209-858-4116 <br /> 3. Frequency of performing the Monitoring Method: <br /> Tank Gauge: Automatic Tank Gauge <br /> Task Monitor: Contnmons interstitial monitoring oftanks <br /> Lane Monitor_ Co�'ioalons interstitial nxomtoriog Cmunnous Lnecbmdcal litre leak detection_ Lines slope bark <br /> to turbine sumps-cont mous liquid monitorting of swops.Positive shutdown Oftmbines. <br /> 4. Method and equipment to be used for performing the monitoring: <br /> Tanks_ <br /> Product Sin UST" Material Cons Yr installed Ovetifntl ] toe Line Mat. <br /> 87 120DD USI' FG DW 98 X JY DW FG <br /> 92 12000 USI FG DW 48 Y X DW FG <br /> DW=Double wan <br /> Monitors: <br /> Product 7ATG <br /> d Mon Make Mon Model Line Meth Line] Line Model PSIS AT BT <br /> 87 VmderRoot TLS-350 Mech Redlacitiet92 VeederRoot TIS-350 Mech Rediacket Y <br /> Inter=Inmrstiitial Monitoring ATC.=Auumfatic Tank G-,ktg g PSD=Positive Sbutdoau <br /> AT=Annual Tank Test <br /> 8T=Bi-ennial Tank Test <br /> I. Locations where monitoring will be performed_ <br /> Tank: Automatic Tank Gauge.Continuous inarstitial monitornog of tanks <br /> Lines: Mechanical line leak dewction;imerstitial space;lines slope back to tnrbme snap- continuous liquid sensing in <br /> tmbme sump. Positive shutdown of Lnbinms <br /> Date Printed: 10/29/97 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.