Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> .RESPONSE PLAN-PAGE 1 (One form per facil ry) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION Rol <br /> I. FACILITY INFORMATION <br /> F'ACILIT'Y[DR (Agemy Use Only) _ _ <br /> BUSINESS NAME(Same as FACILITY NAME) aox <br /> Circle K Store 92701205 <br /> BUSINESS SITE ADDRESSao3 CifY RN <br /> 16470 Cambridge Sweet Lathro <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> Tbis plan addresses unauthorized misuses Rom UST systems and supplemeNs the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> Y If safe to do so,facility personnel will take immediate measures to control or Stop any release(e.g,activate pun3p shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> ➢ Any release W secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency, Recovered hazardous materials,unless still suitable <br /> Ibr their inituded use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hmardmts materinls. Absorbent material may be reused until it becomes too <br /> saturated to be effective. It will Bien be managed property.Used absorbent material,reusable or waste,will be stored in a properly labeled and scaled container. <br /> ➢ Facility personnel will determine whether or not any water removed from secondary containment sy nems,or from clean-up activity,has been in contact with any <br /> hazardous material. if the water is conmminated, It will be manngcd w hiewnions waste. If the waler has a petroleum sheen (i.e., rainbow colors), it M <br /> contaminated. A thick Boating petroleum layer may not necessarily display rainbow colors. Water(hazmdous or non-h ernnous)from sumps,spill containers,etc. <br /> will not be disposed to storm water systems. <br /> ➢ We will review secondary containment systems Ibr possible deterioration If any of the following conditions ocetn: <br /> I. Hazardous material in tautest with secondary containment is not compatible with the material used for secondary conlainmem; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the productlWaste stated in B¢ primary containment system, is placed inside secondary containment to treat or neutralize <br /> released prodactImste,and We added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE:Spill control and clear-up equipment kept permanently on-site is listed in IIx facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,and supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: (Complete only it' plicable <br /> EQUIPMENT LOCATION AVAILABILITY <br /> RID 0.W. RSD <br /> Rn. R21. Rll. <br /> 913. 0.22. au. <br /> R13. R3]. Rb <br /> RIO. RM. RM <br /> all. Ria. R3a <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARG RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY TINDER THIS RESPONSE PLAN: <br /> NAME a90- TITLE Rsa <br /> Service Contact Center 24 Hours <br /> NAME Rsr TITLEasl <br /> 30e\1 .�� ro. U tS� Environmental Compliance Manager for <br /> Circle K Stores Inc. <br /> NAME M3- TITLE wz <br /> NAME R93 TITLE R53_ <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ❑Additional system testing or data collection ®Inspection by qualified persons ❑Recalibmlion of equipment <br /> Other:Tester or Designated Operator RIO <br />