Laserfiche WebLink
STOCKTON SERVICE <br />STATION UVIPMENT CO., Iran <br />CALIFORNIA CONTRACTOR LICENSE 309105 C-61, SA <br />008-020 N. UNION ST. STOCKTON, CALIF. 95205 <br />P.O. BOX 508 STOCKTON, CALIF. 95201 <br />PHONE 209/464-8333 FAX 209/464-6349 <br />BALFS ^❑rnneF • INSTALLATION OF PETROLEUM DISPENSING • LUBRICATION a INDUSTRIAL SERVICE EOt11PMENT <br />( Page two of three) <br />gtocktnn Service Station Equipment Co. Inc. will approach all Lank <br />excavations with possible cave-ins. The following rules will be <br />fnlIOwr`rl to prevent any mishaps. <br />1. Soil to be inspected for stability before and after tank is <br />removed. <br />2. SOIL. is to be kept at least two feet from the edge of an excavatiOnG. <br />3. if excavation i_s five (5) feet or more, the hole shall be tapered. <br />braced , or other equivalent methods shall be used to prevent <br />I.Oasi.hle cave-ins. Precautions will be taken at all times. <br />At t.t4e job site, clean fill will be used to backfill empty hole after <br />loll samples have been Laken by California Water Lab, 1/430 Carpenter <br />bane, Modesto, Calif. 95,351 (209) 527-4050. <br />Soil samples will be excvated using backhoe. Samples will be taken <br />two (2) feet to four (4) feet by hand, using brass tubes. All of <br />the shove procedures will be done according to code. Any part not <br />backfilled, shall be barricaded and caution tape will be used. <br />NOT-L_i 'tank hole will be filled completely as soon as soil samples <br />are taken do to the possible traffic hazards. <br />Stockton Service Station Equipment will use proper equipment for each <br />tank removal. No undersize or bad mechanical equipment will be used. <br />All hcavv equipment will be support properly. Tanks are to be secured <br />at. t -he assigned location after extraction. <br />Sreckt-on .4orvice Station Equipment will provide safety hats, goggles, <br />and vlothing to employees at the job site as per OSIIA regulation 29 <br />CFR 1910, 120. Caution will be noted that a heat stress situation may <br />develop when impermeable protective clothing is worn. <br />Crane operator and equipment will be observed at all times and discussed <br />during safety meeting. <br />Contintind on page three <br />I <br />