Laserfiche WebLink
& a. Describe the method that will be utilized to!T andlor inert the task 4 <br /> b. TankTtping Hauler. <br /> Name <br /> Address � (2, (/( � + Clfy� I 1 up <br /> Phone No� 3 <br /> Hauler Registration N If hauled as bazardous) <br /> C. TanklPiptng Disposal Site: <br /> Name L�-L"T- E r i K Cyt <br /> Address 2 7 nG✓I,�i l> City"( %;q� 21P �& <br /> Phone No.(= 12 3 <br /> EPA mM(ff transported to a permitted TSD facility) C/ <br /> 9. is the sampling firm an independent third party from the contractor? YES I j NO[] <br /> 9a. Describe,in detaD.how the soil{gp_dlor water sample(s)beneath the tank and plpin ywill be obtained / <br /> m A pa 9 - 2 ; 1: <br /> i'IGCil 6-tCt� p0S S i <br /> T-4Vkt, r M, Q lar i r <br /> 10. Describe bow the excavation will be backlDled with sultable material upon removat• <br /> 11. Handling of excavated soil: <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> Ll PJwi ",22,Z <br /> b)What will be the final destination of the excavated stockpile? <br /> S I n �Cn cA �4�� e ec tiY n ' C/ /h o �4vt Ri�Lc e Fed( (✓ c L� " <br /> c)Contaminated Soil Hazardous Waste Hauler. e <br /> Name C Z n 6 Hauler Registration/ J 3 <br /> Address ,� �e�,1� ...e,-�-L`L( L7t7 (-�LYl�tIyYMP� 21p <br /> Phone No.( I G ) 8 35 — I,; <br /> EH 23 046(Revised 10119198) Page 5 <br />