My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_FEB 1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
205
>
2300 - Underground Storage Tank Program
>
PR0231042
>
REMOVAL_FEB 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:54 AM
Creation date
11/2/2018 4:21:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
FEB 1999
RECORD_ID
PR0231042
PE
2381
FACILITY_ID
FA0003613
FACILITY_NAME
ARCO STATION #4493*
STREET_NUMBER
205
Direction
N
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13909003
CURRENT_STATUS
02
SITE_LOCATION
205 N CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CENTER\205\PR0231042\REMOVAL 2_1999.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`iCKFILL EXCAVATION CERTIFICATE <br /> Project Location <br /> ,_` ��. '� � 1 ¢L <br /> tL <br /> Owner � G- Phone No.� <br /> Contractor {_ .I ldL 2 SC 1� � L� 4�h i'�phone No.�'M q '1 5 `�D ,License No. <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> _ 2. Submission of verification, e.F , load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12 lifts: <br /> \' A. Pea gravel--smooth, rounded material not more than one-half(1/2) inch in diameter <br /> _ B. Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between <br /> the backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of project completion, or submission of <br /> verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> ame nn[ <br /> t)— 2 <br /> itle rm <br /> Signature <br /> * Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.