My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_FEB 1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
205
>
2300 - Underground Storage Tank Program
>
PR0231042
>
REMOVAL_FEB 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:54 AM
Creation date
11/2/2018 4:21:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
FEB 1999
RECORD_ID
PR0231042
PE
2381
FACILITY_ID
FA0003613
FACILITY_NAME
ARCO STATION #4493*
STREET_NUMBER
205
Direction
N
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13909003
CURRENT_STATUS
02
SITE_LOCATION
205 N CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CENTER\205\PR0231042\REMOVAL 2_1999.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/11/98 WED 08:47 FAX 918 384 1889 SECOR-SACRAMENTu --- <br /> ARCO Prnducts ComP+ny <br /> At(CO Scml=Sloticn N 4493,Stockton,CA August 25. 1999 <br /> Laboratory Procedures <br /> Soil samples collected during site demolition activities will be submitted to the <br /> laboratory and selected samples analyzed for the presence of total petroleum <br /> hydrocarbons calculated as gasoline (TPH-g), benzene, toluene, ethylbenzcnc, xylenes <br /> (BTEX compounds), and methyl tertiary butyl ether (MtBE) by EPA Mcthods 8015 and <br /> 8020. In addition, selected soil samples indicating field evidence of hydrocarbon <br /> impact will be analyzed for Net oxygenates by EPA Method 8260. <br /> Reporting and Schedule <br /> SECOR anticipates initiating field activities during Autumn 1998. After completion of <br /> the field work and laboratory analyses, the data will be evaluated and assembled into a <br /> report. Included in the report will be soil analytical results, chain-of-custody <br /> documentation, and a summary of field observations, assessment, and conclusions. This <br /> report will be submitted to the SJCEHD within 6 to 8 weeks of receiving analytical <br /> sample results from the laboratory. <br /> If there are any questions regarding the contents of this work plan, please call us at <br /> (916) 364-1880. <br /> Sincerely, <br /> SECOR International Incorporated <br /> og Hoffrnor <br /> Project Geologist <br /> X11 Pj� ¢� au ct°� <br /> G/re`g Barclay t uy No � <br /> y �! <br /> Senior Geologist �O CA4tF�P <br /> RG 6260 <br /> Attachments: FigureI - Site Map, <br /> Attachment A - Field and Laboratory Procedures <br /> any <br /> cc: Mr. Paul Mr. Mark LisIt, R QCB le, ARCO -Central Valroducts ley Region <br /> 70600.021-01/WPlan <br />
The URL can be used to link to this page
Your browser does not support the video tag.