My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_FEB 1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
205
>
2300 - Underground Storage Tank Program
>
PR0231042
>
REMOVAL_FEB 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:54 AM
Creation date
11/2/2018 4:21:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
FEB 1999
RECORD_ID
PR0231042
PE
2381
FACILITY_ID
FA0003613
FACILITY_NAME
ARCO STATION #4493*
STREET_NUMBER
205
Direction
N
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13909003
CURRENT_STATUS
02
SITE_LOCATION
205 N CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CENTER\205\PR0231042\REMOVAL 2_1999.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/11/98 WED 08:48 FAX 916 964 1889 SECOR-SACRAMENTO <br /> SECO R. <br /> 1111"I'll HU11/11l11[ill%1NIY Il Ci) iNK'R#.• <br /> Re: ARCO Service Station 94493 <br /> 205 North Center Street <br /> Stockton, California <br /> The site is located on the west side of North Center Street just north of Weber Avenue <br /> and the Stockton Deep Water Channel in Stockton, California. The site is currently an s . <br /> inactive AM/PM mini-mart and ARCO Service Station. As part of a change in <br /> ownership, all site facilities are being removed. <br /> In accordance with the work plan on file with San Joaquin County Public Health <br /> Department, Environmental Health Division (SJCEHD) dated August 25, 1998, the <br /> following work will be performed: <br /> 1) the removal of the underground gasoline fuel storage tanks, product lines, and <br /> dispensers; <br /> 2) sampling of soil beneath these facilities to evaluate the presence of hydrocarbons in ��„ <br /> soil at the subject site; and '% <br /> 3) over-excavation of up to 100 cubic yards of hydrocarbon saturated soil above the <br /> groundwater table, if necessary. Applicable permits for the removal activities will <br /> be obtained by ARCO's contractor prior to [he start of any work. <br /> Work will be performed during weekday daylight hours. Earth moving equipment may <br /> include a backhoe, an excavator, a loader, and other equipment as appropriate- <br /> Excavated soils and debris that contains petroleum hydrocarbons will be temporarily <br /> stored onsite covered with plastic sheeting, or with approval from the San Joaquin <br /> Valley Air Quality Management District controlled onsite aeration of the soil will be <br /> conducted and resulting clean soil will be reused as fill. Excavation activities will be <br /> observed by SJCEHD and SECOR representatives. Soil samples will be collected and <br /> analyzed per SJCEHD requirements. Upon receipt of sample results, SECOR will <br /> prepare and submit to SJCEHD a letter report summarizing removal activities and <br /> sampling results. Work is anticipated to commence during Autumn 1998- <br /> 9912 Butinm Park Drivc, <br /> 998- <br /> 9912ButinmPark•Drivc, Sufte100, Sacramenlo, CA95827 (916),364-1880(916)-364.1i4N9 FAN u,lrvo-accorrom <br />
The URL can be used to link to this page
Your browser does not support the video tag.