Laserfiche WebLink
MONITORING EQUIPMENT ON SITE <br /> Oxygen Meter/LEL YES NO <br /> Other <br /> PROTECTIVE EQUIPMENT <br /> Temporary Fencing YES <br /> Barricades YES NO <br /> Trench Plate YES NO <br /> Shoring YES NO , <br /> Fire ExtinguishersYES ; NO <br /> Warning signsYES NO <br /> v <br /> RISK ASSESSMENT I ( 1/ <br /> Un W 1 �s <br /> EXPOSURE MONITORING PLAN <br /> Environmental exposure will be monitored periodically using a hand <br /> held LEL/02 meter. Personal exposure monitoring ( in addition to <br /> the required annual check-up) will not be conducted. All personnel <br /> have been approved for respirator use. <br /> All TPC personnel have current 40 hour OSHA certification. <br /> WORK ZONES AND SECURITY MEASURES <br /> Site access is restricted through appropriate fencing and/or <br /> barricades. <br />