My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2000 PLAN
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
322
>
2300 - Underground Storage Tank Program
>
PR0516472
>
INSTALL_2000 PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:37 AM
Creation date
11/2/2018 4:22:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2000 PLAN
RECORD_ID
PR0516472
PE
2361
FACILITY_ID
FA0012628
FACILITY_NAME
UNITED #5449
STREET_NUMBER
322
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14906111
CURRENT_STATUS
01
SITE_LOCATION
322 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CENTER\322\PR0516472\INSTALL PLAN 2000.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FUELING ISLAND LAYOUT C411_15ARC-0 ENCORE 5ELECT 15LENDER, 40 WIDE <br />6GALE� 1/4o = 1,-0o <br />T5 (ox0x3116" W10ELIDE[D 5TEEL <br />TOP, FILL 4Y CONIC- 4 PAINT <br />WAlTE(0A-a3E� - CONFIRM) <br />EL45TOMER|C SEALANT <br />D16FIEN6ER E3,46E <br />C,ONC.P4VEMENT <br />FROV|C}rE 6L|F- 6AEET5ETWEBN <br />P05TFOOT|NG 4 CCNC. 5L4E3 <br />(3011FELT OR 5IM(LAR) <br />la''O CONCRETE FOOTING <br />5CALE: 1/2" = |'-&Do <br />^ --^-"- <br />//*' N4 <br />TOvOLE <br />NOT TO 6CALE <br />3/5"PRE-MOLDEC) <br />EXP4NB|ON MATERIAL <br />(FULL DEFTAOF CONC. <br />in <br />DISPENSER <br />FILTER <br />1 1/2^0 SCH. 40 BLACK IRON <br />PIPE RISER <br />1 1/2" N.P.T. INLET UNION ---- <br />(BY DISPENSER MFG] <br />FILTER CHANGE TRIP TRAY ----- <br />(BY DISPENSER MFG.) <br />DUAL POPPET IMPACT VALVE <br />(SHEAR SECTION TO BE FLUSH <br />WITH TOP OF DISPENSER ISLAND) <br />3/4" P.V.C. PUMP OUT PIPE <br />WITH THREADED FITTING -- <br />F.R.P. DISPENSER CONTAINMENT SYSTEM <br />45' BLACK IRON ELBOW <br />u <br />2 1/2" MINIMUM CLEARANCE <br />BETWEEN FITTING & PIPE <br />2"0 FR.P, PIPE <br />YO ER,P. PIPE --- <br />SUMP PENETRATION BOOT <br />MINIMUM <br />CLEARANCE <br />BETWEEN <br />PIPE <br />DISPENSER <br />GENERAL CONTRACTOR TO PROVIDE <br />RIGID PIPING TO EACH VAPOR RECOVERY <br />MANIFOLD <br />CA.R.B. AUORlVED DUAL POPPET <br />VAPOR SHUTOFF VALVE <br />(SHEAR SECTION TO BE FLUSH <br />WITH TOP OF DISPENSER ISLAND) <br />� <br />45^ BLACK IRON ELBOW <br />S" MINIMUM PEA GRAVEL <br />COVER OVER FR,P, PIPE <br />2~0 F.R.P. VAPOR RECOVERY PIPE <br />SUMP PENETRATION BOOT -- <br />3" TO 2" REDUCER <br />WITH TEST PORT <br />(ROLLBACK BOOT AFTER TESTINC) <br />NOTE: MOUNT VAPOR SHUTOFF VALVE USING <br />VAPOR IMPACT VALVE SUPPORT KIT. <br />5CALE. NONE <br />FRODOOC7 <br />u ' <br />< 4 <br />wa p" (OR RECOW19mv <br />O INSTALL. PMANUFACTURER'S (SOME <br />SHOWN FOR DRAFTING CLARITY.) <br />1. SUPREME NOZZLE MUST ALWAYS BE ON THE LEFT, <br />2. PRODUCT PIPING (HARD) MUST ALWAYS PENETRATE THE DISPENSER SUMP FROM THE OPPOSITE SIDE OF THE <br />CONDUIT, <br />3, PLUG ON VAPOR SHEAR VALVE MUST BE ACCESSIBLE. <br />4� USE RIGID PIPE (INSTEAD OF HOSE) FOR VAPOR INSIDE ALL DISPENSERS, <br />5. INSTALL VAPOR SHEAR SUPPORT FROM TOP OF SHEAR VALVE TO DISPENSER. <br />5. PULL BACK REDUCERS IN DISPENSER BOXES AFTER SECONDARY PIPE HAS BEEN TE,) -IED. <br />1. RLL DISPENSER SUMP WITH WATER UP TO HIGHEST PENETRATION, <br />REMOVE WATER WHEN DIRECTED BY OWNER'S REPRE3ENATIVE <br />2. WHEN TESTING PRODUCT LINES, INSTALL STEEL CAP ON OPEN <br />SHEAR VALVES 70 AVOID DAMAGE TO THE VALVE. <br />EXPLOSION PROOF JUNCTION BOX <br />SEAL OFF <br />PIPE CAP WITH HOLE FOR \ <br />CONTAINMENT PROBE WIRE <br />SEAL ALL, OPENINGS WATER TIGHT <br />SLOPE CONCRETE <br />i <br />5% FOR 10" <br />AT FACE OF <br />DISPENSER (TYP) / <br />AB|UZER BAR <br />SUMP PENETRATION BOOT <br />FOR CONDUIT, TYP, <br />1` CONDUIT TO CONTROL <br />PANEL (POWER) <br />1" CONDUIT TO CONTROL <br />PANEL (DATA) <br />3/4" CONDUIT TO CONTROL <br />PANEL (SPEAKER) <br />3/4" CONDUIT FOR CONTAINMENT <br />BOX PROBE TO MONITOR PANEL <br />P.KC. PIPE OPEN AT BOTTOM. <br />ATTACH TO CONTAINMENT BOX <br />AS NEEDED FOR SUPPORT (D0 NOT <br />PENETRATE SUMP), <br />SUMP SENSOR <br />1 1/2"M SWIVEL. x 2"F x 24" <br />FLEXIBLE CONNECTOR, ALTERNATE <br />FLEXIBLE CONNECTOR WITH ELBOW <br />N0E: <br />USE APPROVED NON -HARDENING <br />JOINT COMPOUND <br />FOR THREADED CONNECTIONS. <br />2" BELL & MALE F.R.P. <br />THREADED ADAPTOR <br />1 1/2^M SWIVEL x 2"FX 24" <br />FLEXIBLE CONNECTOR <br />N OTE: <br />USE APPROVED NON -HARDENING <br />JOINT COMPOUND FOR THREADED <br />CONNECTIONS. <br />2" BELL & MALE F.R.P. <br />THREADED ADAPTOR <br />m <br />+ <br />� <br />fy � <br />�u/�+�� <br />= <br />wmO Om <br />�mzUA <br />�� <br />�� �� <br />~� ��+ <br />w� m^ <br />U4 <br />-1 ��`,� <br />�mO�� <br />~�u�z� <br />-- 0 <br />������ <br />� <br />+ sui�� <br />0�� m�= <br />������ <br />w ZFZ � <br />���� <br />�� <br />� <br />V <br />mu z0�� <br />ul <br />-�z+^�ruty <br />m <br />OF L3 eHEETe <br />+ <br />� <br />fy � <br />�u/�+�� <br />= <br />wmO Om <br />�mzUA <br />�� <br />�� �� <br />~� ��+ <br />w� m^ <br />U4 <br />-1 ��`,� <br />�mO�� <br />~�u�z� <br />-- 0 <br />������ <br />� <br />+ sui�� <br />0�� m�= <br />������ <br />w ZFZ � <br />���� <br />�� <br />� <br />V <br />mu z0�� <br />di �0 <br />-�z+^�ruty <br />�� <br />���� <br />mm a/ C) <br />A O <br />+� <br />�� <br />� w <br />- <br />� 0 <br />�_ <br />� � _ <br />�� � U <br />fy <br />OF L3 eHEETe <br />
The URL can be used to link to this page
Your browser does not support the video tag.