Laserfiche WebLink
STATE OF CAUFORNA <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM 8a <br /> COMPLETE A SEPARATE FORM FOR EACH TANK <br /> SYSTEµ <br /> MARK ONLY ❑ i NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION 7 PERMANENTLY CLO SITE <br /> ONE REM ❑ 2 INTERIM PERMIT ❑ A AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE 6 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: k'x '0.C. 1\06 <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNERS TANK I.0.6 \ ER:- =MANUFACTURED BY: 6C. DATE INSTALLED(MO/DAYHEAR) -�1 CAPACITY IN GALLONS: <br /> II.TANK CONTENTS IFA-11SMARKED.COMPLETE ITEMC. <br /> A. X) 1 MOTOR VEHICLE FUEL ❑ t OIL S. C 1AUNLEADED <br /> REGULAR 3 DIESEL ❑ 6 AVIATIONGAS <br /> LMJ <br /> ❑ 2 PETROLEUM ❑ W EMPTY ® 1 PRpp(JCT ❑ Ib PREMIUM A GASAIgI ❑ 7 METHANOL <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNIQHOWN ❑ 2 WASTE 2 UNLEADED a 5 JET FUEL <br /> ❑ LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELO" <br /> D. IF(AA)IS NOT MARKED. ENTER NAME OF SUBSTANCE STORED <br /> C.A.S.9: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.S.AND C.AND ALL THAT APPLIES IN BOX D AND <br /> A. TYPE OF ❑ I DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM ® 2 SINGLE WALL ❑ A SECONDARY CONTAINMENT (VAULTED TANK) ❑ W OTHER <br /> B. TANK ❑ I BARE STEEL ❑ 2 STAINLESS STEEL ® 3 FIBERGLASS ❑ A STEEL CLAD Wi FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ S CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ B 10DI. METHANOL COMPATIBLE WIFRP <br /> (Primary TA6k) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ W OTHER <br /> ❑ I RUBBER LINED ❑ 2 ALKYD LNIN <br /> NG ❑ 3 EPDXY LINING ❑ ♦ PHENOLIC LING <br /> C.W ❑ 5 GLASS LINING ® 6 UNLINED <br /> LINING NING ❑ 95 UNKNOWN ❑ W OTHER <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL 7 YES— NO— <br /> D.CORROSION ❑ I POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ENI A FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHOOK:PROTECTION ❑ 91 NONE ❑95 UNKNOWN ❑ W OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U I SUCTION AG 2 PRESSURE A U 3 GRAVITY A U W OTHER <br /> 8. CONSTRUCTION AQ), SNGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U W OTHER <br /> C. MATERIAL AND A U I BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U A FIBERGLASS PIPE <br /> CORROSION A U S ALUMINUM A U 6 CONCRETE A U 7 STEEL"COATING <br /> A U 6 100% METHANOL COMPATIBLE WrFRP <br /> PROTECTION 1 U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U W OTHER A� <br /> 0. LEAK DETECTION ® I AUTOMATK;UNEIEAKDETECTOR ® 2 LINETGNTNESSTESTING ❑ IIDNROPWG ❑W OTHER /9 <br /> V.TANK LEAK DETECTION <br /> ❑ I VISUAL CHECK ❑ 2 NVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ A AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> 6 TANK TESTING ❑ 7 INTERSTITIALMONRORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ W OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAS ED(I /AYMR) 2.ESTIMATED QUANTITY OF �LONS 3 WAS TANK FILLED <br /> WITH YES ❑ <br /> 'L\In SUBSTANCE REMAINING <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME <br /> IPRIK Da SK ANM \` DATE <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMB RS BE <br /> COUNTY 9 JURISDICTION s FACB. • TANK 9 <br /> STATE I.D.# 5 <br /> PERMIT NUMBER PERMIT APPROVED BYIDATE PERMIT EXPIRATION DATE <br /> VV <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. /) a <br /> FILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE UNDERGROUND STORAGE REGULATIONS '--?U/IP-� <br /> FORM 8 (12-91) ROMMI-AF <br />