My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
441
>
2300 - Underground Storage Tank Program
>
PR0231056
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2024 3:06:29 PM
Creation date
11/2/2018 4:48:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231056
PE
2381
FACILITY_ID
FA0003628
FACILITY_NAME
ARCO STATION #2168*
STREET_NUMBER
441
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707607
CURRENT_STATUS
02
SITE_LOCATION
441 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHARTER\441\PR0231056\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
3/9/2012 8:00:00 AM
QuestysRecordID
114394
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA �. <br /> STATE WATER RESOURCES CONTROL BOARD s� <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM B u <br /> 'I <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT [�J'5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ONSITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: 'PI12-G-0 FFiL F.10, 2%L#$ (�(/ <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNERS TANK I.D.# 2- V"L-P— B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MQOAY/YEAR) O4 /-/-70 <br /> 7p D. TANK CAPACITY IN GALLONS: L 00� <br /> ILTANKCONTENTS IFA-11SMARKED,COMPLETE ITEM C. �, i <br /> A �1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C. -i aUNLEAD REGULAR 3 DIESEL ❑ 6 AVIATIONGAS <br /> ❑ 2 PETROLEUM ❑ 80 EMPTY ©^1 PRODUCT ❑ 1b PREMIUM 4 GASAHOL ❑ 7 METHANOL <br /> F73 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 LEADED <br /> 2 WASTE ❑ UNLEADED 17i 993 OTHERL(DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.# <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B.AND C,AND ALL THAT APPLIES IN BOX D AND <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM 2 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK [jo 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (PrimaryTank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> 1 ❑ 1 RUBBER LINED ❑� 2 ALKYD LINING F73 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING 1�. - UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 106%METHANOL? YES_ NO_ <br /> D.CORROSION ❑ i POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE E2-95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A©2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION AQ 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)p U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION Eer AUTOMATIC LINE LEAK DETECTOR ©2 LINE TIGHTNESS TESTING ❑ MONRORING ❑99 OTHER <br /> V.TANK LEAK DETECTION <br /> Lt?ll VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> [-w�< TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES ❑ NO ❑ <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANT`S NAME 1 DATE <br /> (PRINTED a SIGNATURE) tAU <br /> LOCAL AGENCY USE ONLY T E STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUM RS BELOW <br /> COUNTY# JURISDICTION# �FACILITY# TANK# On <br /> STATE I.D. � (aPERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM AED. <br /> `/ �� (/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.