Laserfiche WebLink
s. aQ13cribe the method that will be WHIZed to Varge andl r inert the tawgsy <br /> b. TanklPlpffig Haul <br /> Name4f /�� /A� r ' 1' �s— ��1 <br /> Address &LZ,- /�C[�^��f)-C-A) :C-r CltyTZI&&K�— Mp t c�R6 <br /> Phone No4� ))( 6 R —'7S-?U'` <br /> Hauler Registration M(if hauled as hazardous) <br /> c <br /> ping Disposal te: <br /> Name <br /> Address ` d 0 /moo- MY f/de- Zp92-F-C) <br /> Phone%4001 — 7 <br /> EPA IDA(If transported to a permitted TO facility) <br /> 9. Is the sampling firm an independent third party from the contractor? YES Hall <br /> 9a. Describe,in detall.hoyg�tthee soil and/orugater sampl s)beneath the and g�ptug <br /> 1 1R6iF r <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal <br /> i. <br /> 11. Handling of excavated soil: <br /> \a)/What material will be used to line the tank pit and cover the stockpile? � ^ <br /> b)What will be the final destination of the excavated stockpile? <br /> f(�lLv 1j�5cll .f.�c11 l— 77c.Q L C&Vr 9,7 <br /> FbA- <br /> c Contaminhted fSall Ha` ons Waste Hauler <br /> NameF t �>c� —r,� 2� Hauler Registration t <br /> Address /�� ( '-"�"1e O 21p <br /> Phone No. <br /> EH 23 046(Revised 10119198) Page 5 <br />