Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUNDSTORAGETANK <br /> MONITORINGPLAN (Page2of2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC JIONITORING IS PERFORJIED USING THE FOLLOWING JIETHOD °90.54 <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING [:]2.FLOAT AND CHAIN ASSEMBLY [33.ELECTRONIC STAND-ALONE 90.64b <br /> 0 4_NO DISPENSERS099.OTHER(Specify): <br /> PANEL MANUFACTURER:Veeder-Rcpt °9066 MODEL B:TL$-350 °Wis <br /> LEAK SENSOR MANUFACTURER:Vader-Root N0.99 MODEL q(S):794380208 J9p'66 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS (0 a YES ❑b.NO 490.39 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN M a.YES ❑It.NO i9O6o. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑b.NO 496'6] <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ® a.YES ❑b.NO _ 49o.a2 <br /> 2.UDC CONSTRUCTION IS RL SINGLEAVALLED ❑2.DOUBLE-WALLED 49e6I <br /> IF DOUBLE WALLED: T9o.64i <br /> UDC INTERSTITIAL SPACE IS MONITORED BY_ L LIQUID ❑2_ VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO '1906'6 <br /> VH.PERIODIC SYSTEM TESTING <br /> 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 49065. <br /> ___ EAK DET LD MUST BF.PERFORMED_PERIODIC ELD IS PERFORMED EVERY36 MONTHS AS REQUIRED.(,23 CCR ft2644_lj <br /> ®2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. <br /> .-_—__-_._..-.__ -_-________—__--._.__—___._____-.._. ___._....__—__-_�..._—_.-._�______.______ <br /> ®3.SPILL BUCKETS ARE TESTED ANNUALLY. 49ae7 <br /> VHI.RECOROKEEPING <br /> The following monitoring/maintemanee records are kept for this facility: <br /> ®Alarm logs 49ass. ❑Visual Inspection Records 49 b ®'rank integrity testing results 49 <br /> ®SIR testing results(and supporting documentation records). 49 W ® Tank gauging results(and supporting documentation records). 49v . <br /> ®ATG Testing results(and supporting documentation records).49 r ❑ Corrosion Protection 60-day logs 49aeaa <br /> ®Equipment maintenance and calibration records. 490bab <br /> 1X.TRAINING <br /> ®Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties. 49oa9s <br /> REFERENCE DOCUMENTS MAINTAINED KI'FACILITY(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490696 <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) <br /> ® CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490694 <br /> ® CALIFORNIA UNDERGROUND STORAGE TANK LAW 490696 <br /> ® STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"49069r <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"49 , <br /> ❑ OTHER(Specify):mih,.mm <br /> This facility has a"Designated UST Operator'who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator'will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> • The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> D The facilityemployees role with regard to spills and overfills as specified in the UST Response Plan <br /> D Names ofcontact person(s)for emergencies mid monitoring alarms.4 7o <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional Information on specific monitoring procedures arc attached to this plan.49 711 <br /> ere 7 T A Ic �f(D( <br /> XI. PERS i EL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST Ink detection equipment covered by <br /> this plan occurs,2)all conditions dint indicate a possible release arc investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for perforating the monitoring and equipment maintenance: <br /> NAME Gilbert Silva 49 7z TITLE Contact <br /> 49x71 <br /> NAME Gilbert Silva 49x74 TITLE Contact <br /> 4W73 <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operaWr,and inform the ownedopemtor of any <br /> conditions that need follow-tip action. <br /> XH,OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify,Lha tion provided herein is True and accurate to the best of my knowledge. <br /> APPLICANT SIGN 49x76 DATE: 49x77 <br /> 12.22-2009 <br /> APPLICANT NAME(print): 490.�a APPLICANT TITLE: 49a->9 <br /> Gilbert Silva Contact <br /> UPCF UST-D(12/1007)3/4 <br />