Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI. UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 49o-54. <br /> ago ob <br /> 1.CONTINUOUS ELECTRONIC MONITORING [12.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS ❑99.OTHERS i <br /> PANEL MANUFACTURER- <br /> LEAK <br /> ANUFACTURERS�__ 49o-s6. <br /> LEAK SENSOR MANUFACTURER: 6C� _ j 4905') MODEL#(S): Po 49018 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS 99 a.YES ❑b.NO 4so-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN IN a.YES ❑b.NO 49 <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. IF a.YES ❑b.NO 49pb1 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER 19a.YES ❑b.NO 49062 <br /> 2.UDC CONSTRUCTION IS RUL SINGLE-WALLED ❑2.DOUBLE-WALLED 490.61 <br /> IF DOUBLE WALLED: 490648 <br /> UDC INTERSTITIAL SPACE IS MONITORED BY Q I LI UID 112.PRESSURE ❑3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 490-646 <br /> VII.PERIODIC SYSTEM TESTING <br /> ❑ I. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-6s. <br /> LEAK DETECTION ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.(23 CCR§2644.1) <br /> ❑2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66 <br /> ❑3.SPILL BUCKETS ARE TESTED ANNUALLY. -49u67 <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> Alarm logs 490-68a Visual Inspection Records 490-686 .�3-t+�Tank integrity testing results 49oesc <br /> SIR testing results(and Visual <br /> documentation recorcls). 490aaa _ Tank gauging results(and supporting documentation records). 49o.68e <br /> ATG Testing results(and supporting documentation records).4% Sf ❑ Corrosion Protection 60-day logs 49o-6&g <br /> Equipment maintenance and calibration records. 490686 <br /> IX.TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties. 4"49a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)49 % <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)4669[ <br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 49069a <br /> CALIFORNIA UNDERGROUND STORAGE TANK LAW 4o <br /> STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"4ofi9r <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490698 <br /> ❑ OTHER(Specify):M69h,M6% <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact persons)for emergencies and monitoring alarms.49070 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate haw many pages with additional information on specific monitoring procedures are attached to this plan.4907i <br /> o ti ii `moi w�ac - 9� <br /> XI.PERSONNEL E PONSgLITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2 dition icate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following 1 r performing the monitoring and equipment maim nce. <br /> NAME 4w-72 TITLE y 49041 <br /> NAME f C-4— 490.04 TITLE <br /> 49an <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> OWNEWOPERATOR SIGNATURE <br /> CERTIFICATION:I certify orm on geU4clecl herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE 4%-96 DATE: 4967 <br /> fL -y-'� <br /> MtI=ANTNAME(print): °90']8 APPLICANT TITLE: <br /> UPCF UST-D(12/2007)3/4 <br />