My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
610
>
2300 - Underground Storage Tank Program
>
PR0521866
>
COMPLIANCE INFO_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 3:49:10 PM
Creation date
11/2/2018 5:12:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015
RECORD_ID
PR0521866
PE
2371
FACILITY_ID
FA0014852
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
610
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
04745039
CURRENT_STATUS
01
SITE_LOCATION
610 S Cherokee Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\C\CHEROKEE\612\PR0521866\COMPLIANCE INFO 2015 .PDF
QuestysFileName
COMPLIANCE INFO 2015
QuestysRecordDate
11/1/2016 4:22:19 PM
QuestysRecordID
3247247
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification - Page 3 of 3 <br />KtUt1V CU <br />NOV 2 3 2015 <br />ENVIRONMENTAL <br />NFAITU nCOAD ANCK T <br />Site Address: 610 S. Cherokee Ln. Date of Testing/Servicing: 10/26/15 <br />F. In - Tank Gauging / SIR Equipment: <br />m Check this box if tank gauging is used only for inventory control. <br />a Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Com lete the followin checklist: <br />0 Yes <br />0 No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />0 Yes <br />0 No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />0 Yes <br />0 No* <br />Was accuracy of system product level readings tested? <br />0 Yes <br />0 No* <br />Was accuracy of system water level readings tested? <br />Yes <br />❑ No* <br />Were all probes reinstalled properly? <br />❑ Yes <br />O No" <br />Were all items on the equipment manufacturees maintenance checklist completed? <br />" In Section H below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): D Check this box if LLD's are not installed. <br />m Yes 0 No* i For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br />0 NIA I (Check ail that apply) Simulated leak rate: ® 3 g.p.h. (l.); 0 0.1 g.p.h. (2.); ❑ 0.2 g.p.h. (2.). <br />Notes: 1. Required for equipment start-up certificationnod annual certification. <br />2. 1 tnless mandated by local aeenev. certification required only for electronic LLD star -up. <br />W Yes <br />0 No* <br />Were all LLD's confirmed operational and accurate within regulatory requirements? <br />to Yes <br />0 No* <br />Was the testing apparatus properly calibrated? <br />m Yes <br />0 No* <br />0 N/A <br />For mechanical LLD's, does the LLD restrict product Flow if it detects a leak? <br />0 Yes <br />0 No* <br />m N/A <br />For electronic LLD's, does the turbine automatically shut off if the LLD detects a leak? <br />0 Yes <br />0 No* <br />M N/A <br />For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />or disconnected? <br />0 Yes <br />0 No* <br />III N/A <br />For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system <br />malfunctions or fails a test? <br />0 Yes <br />0 No* <br />m N/A <br />For electronic LLD's, have all accessible wiring connections been visually inspected? <br />M Yes <br />0 No* <br />I Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.