Laserfiche WebLink
f. <br /> UNIFIED PROGRAM CONSOLIDATE <br /> UNDERGROUNDSTORAGETANK <br /> MONITORING PLAN-(Page 2 of 2 <br /> UNDER DISPENSER CONTAINMENT(UDQ MONITORING.._.. «o° <br /> uror h l <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHODS) <br /> ❑ 1.CONTINUOUS ELECTRONIC MONROR No ® 2 FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 4Wsr' <br /> ❑ 4.NO DISPENSERS ❑ 99.OTHER(Specify) <br /> LEAK MONITOR MANUFACTURER: +sass. MODEL C �56 <br /> .LEAK SENSOR MANUFACTURER 49as]' MODEL/(S): - 'rsa58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ® b.NO 4sa5° <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. - ® LYES ❑ b.NO Oso sc <br /> FAII,UREIDISCONNECfION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® s::YES :❑ b:NO 4'"' <br /> - <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER ® a.YES ❑ b.NO <br /> UDC CONSTRUCTION IS: ® 1.SINGLE WALL ❑ 2 DOUBLE WALL ' <br /> IF DOUBLE WALL: 4sasu <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE ' ❑ a VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a:YES ❑ b.NO 4saa"- <br /> VII. PERIODIC SYSTEM TESTING <br /> Li 1.ETA TESTING:.THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED � ` <br /> D MUST BE PERFORMED. PERIODIC EIA IS PERFORMED EVERY 36 MONTHS AS REQUIRED.rp not j2w.ij <br /> ® 2 SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. <br /> ® 3.SPILL BUCKETS ARE TESTED ANNUALLY. 4 7. <br /> VIII. RECORD KEEPING <br /> The following monitoring/maimenma records are kept for this facility. '. - 49ass <br /> ® s:ALARM LOGS ;�;�.. ® b.VISUAL INSPECTION RECORDS ® c.TANK IN'T'EGRITY TESTING RESULTS <br /> ` ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> --:•�, ❑ E ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 6o-DAY LOGS <br /> h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX" TRAINING —' <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: racer.. <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILrry(Check ail rdar apply) .a. <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 4so , <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) <br /> ® CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 4sacsd. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> ❑ STATE. WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND renes( <br /> STATISTICAL INVENTORY RECONCILIATION" - <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 49x6 , <br /> 4_'. .0 OTHER(Specify): :.. 4906%: <br /> This facility has a"Designated UST Operator'who bas passed the California UST System Operator Exam administered by the International Code Council 4W76 <br /> -.. (ICC), The"Designated UST Operator'will train facility employees in the proper operation and maintenance of the UST <br /> systema annually,and within 30 <br /> ' - Jaya of him Ibis training will include,but is not limited to,the following: <br /> > :Operxdm of the UST systems in a manner consistent with the facility's best management practices. <br /> > The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Pian. <br /> > 'The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plsa <br /> ': > Name(s)of contact person(s)for emergencies and mmitormg elam:s. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 490-71. <br /> M. PERSONNEL RESPONSIBILITIES <br /> 1by <br /> The UST Owner/Opcator is responsible for ensuring that: 1.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered tttia plan occurs:2. all conditions that indicate a Dossible release aro investigated;and 3. all monitoring records are maintained <br /> { THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME:- . a:.'; " . 4soa. :71IIE:.. -:... 4sa7 <br /> NAME:_ . <br /> . . 4s 74- ITIEi <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> " '. conditions that need follow-up action: <br /> WNERIOPERATOR SIGNATURE <br /> CERTMCAT ION:I eertia information rov ed herein is true and acevnte to the best of m knowledge, <br /> .APPI;ICANT SIGNATURE :. .. DATE:12 <br /> W -1 2 J.Autl:or@cd MO.m <br /> AYPI.ICANTNApM�aB � ):�•, Q res APPLICANTTITLE' 4varv. <br /> ./ <br /> I 'WWW.iuidoea. rg <br /> .qtr <br />