My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2009 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
800
>
2300 - Underground Storage Tank Program
>
PR0231325
>
COMPLIANCE INFO 2009 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2022 1:47:12 PM
Creation date
11/2/2018 5:16:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2015
RECORD_ID
PR0231325
PE
2361
FACILITY_ID
FA0003997
FACILITY_NAME
PLAZA LIQUOR #1
STREET_NUMBER
800
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742004
CURRENT_STATUS
01
SITE_LOCATION
800 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHEROKEE\800\PR0231325\COMPLIANCE INFO 2009 - 2015 .PDF
QuestysFileName
COMPLIANCE INFO 2009 - 2015
QuestysRecordDate
3/28/2017 7:00:00 PM
QuestysRecordID
3360547
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> F. In-Tank Gauging!SIR Equipment; Check this box if tank gauging is used only for inventory control, <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> roper entry and termination,including testing for ground faults? <br /> 11 Yes ❑ No' Has all input wiring been inspected for p <br /> ❑ yes ❑ No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No` Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No' Was accuracy of system water level readings tested? <br /> ® Yes ❑ No' Were all probes reinstalled properly? <br /> ❑ Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In Section H,below,describe flow and when these deficiencies were or will be corrected. <br /> Line Leak Detectors(LLQ): ❑ Check this box if LLDs are not installed. <br /> Com lete the following checklist: <br /> ® Yes T[3 <br /> No For equipment start-up or;annual equipment certification, was a leak simulated to verify LLD performance? {Check all that apply) <br /> NIA Simulated leak fate: ®3 g.p.h.; ❑0.1 g.p.h ❑0.2 g.o.h. <br /> ® Yes o' Were all LLDs confirmed o stational and accurate within regulatory requlremenis7 <br /> Yes o` Was the testing apparatus properly calibrated? <br /> ® Yes ❑ No` For mechanical LLDs,doe the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No' For electronic LLDs,does he turbine automatically shut off if the LLD detects a leak? <br /> } NIA <br /> ❑ Yes ❑ No" For electronic LLDs,does he turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> N/A <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> NIA <br /> ❑ Yes ❑ No" For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ <br /> NIA <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> `In Section H,below,describe how and when these deficiencles were or wNl be corrected. <br /> H. Comments: <br /> nnnn un.in� <br /> 2/21/07 <br /> Rvstam Certification <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.