Laserfiche WebLink
1 <br /> SWRCB, January 2002 Page of <br /> 9. SPILUOVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/overfill Containment Boxes i"] <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: ❑ Spill Bucket Manufacturer 0 Industry Standard ❑ Professional Engineer <br /> ❑Other(8pecify) <br /> Test Method I s ❑Pressure ❑Vacuum 0 Hydrostatic <br /> ❑Other(.Sped) <br /> Test Equipment Used: Equipment Reso tion: <br /> Spill Bax Spill Box# pill Box# Spill Box# <br /> Bucket Diameter: `" <br /> Bucket Depth: <br /> w Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: ` l <br /> Initial Reading(Ri): <br /> Test End Time: <br /> Final Reading(RF): `> <br /> y <br /> Test Duration: <br /> Change in Reading <br /> Pass/Nail Thresh or <br /> Criteria: <br /> Test Result: C] Pass ❑Fail ❑ Pass ❑ Fail ❑ Pass 0 Fail ❑ Pass ❑ Fail <br /> Com nts— (include information on repairs made rior to testin , and recommended ollow-u or ailed tests) <br /> �$' `� U IA! 4 Ute 'i J <br />