My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2009 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
800
>
2300 - Underground Storage Tank Program
>
PR0231325
>
COMPLIANCE INFO 2009 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2022 1:47:12 PM
Creation date
11/2/2018 5:16:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2015
RECORD_ID
PR0231325
PE
2361
FACILITY_ID
FA0003997
FACILITY_NAME
PLAZA LIQUOR #1
STREET_NUMBER
800
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742004
CURRENT_STATUS
01
SITE_LOCATION
800 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHEROKEE\800\PR0231325\COMPLIANCE INFO 2009 - 2015 .PDF
QuestysFileName
COMPLIANCE INFO 2009 - 2015
QuestysRecordDate
3/28/2017 7:00:00 PM
QuestysRecordID
3360547
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> Software Version installed: <br /> Com lete the followin checklist: <br /> Yes ❑ No* Is the audible alarm o erational? <br /> Yes O No* Is the visual alarm o erational? <br /> Yes ❑ 'No* Were all sensors visually inspected, functional3tested, and confirmed o erational? <br /> Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No* If alarms arc relayed to a remote monitoring station, is all communications equipment (e.g. modem <br /> '�.NIA operational? ) <br /> `Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply);KSump/Trench Sensors; ❑ Dispenser Containment Sensors. <br /> Did yon confirm positive shut-down due to leaks and sensor failure/disconnection? Yes; ❑ No. <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as. the primary tank overfilt warning device (i.e. no <br /> N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> l fill oint(s)and operating ro erl ? If so,at what percent of tank capacity does the alarm treck i er? <br /> El es* No Was any monitoring equipment replaced? If yes, identify specific sensors,probes, or other equipment replaced <br /> and list the manufacturer name and model for all replacement arts in Section E,below. <br /> El Yes* No Was liquid found inside any secondary containments stems desiwed as dry systems. (Ch <br /> Product; ElWater. If es,describe causes in Section E.below. all that apply) C] <br /> Yes ® No* Was monitoring s stem set-up reviewed to ensure pro er settin s?Attach set u re orfs, if a licable <br /> Yes ❑ No* Is all monitonin a ui mento erational er manufacturer's s ecificatioas? <br /> '� In Section k, below,describe how and when these deCcieneies were or wilt 6e corrected. <br /> E. Comments: <br /> Page 2 of 3 <br /> 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.