My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1994
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
23901
>
2300 - Underground Storage Tank Program
>
PR0505423
>
REMOVAL_1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:50 AM
Creation date
11/2/2018 5:24:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1994
RECORD_ID
PR0505423
PE
2381
FACILITY_ID
FA0009484
FACILITY_NAME
SUBURBAN PROPANE TRACY
STREET_NUMBER
23901
Direction
S
STREET_NAME
CHRISMAN
STREET_TYPE
Rd
City
Tracy
Zip
95304
CURRENT_STATUS
02
SITE_LOCATION
23901 S Chrisman Rd
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHRISMAN\23901\PR0505423\REMOVAL 1994.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.*SAN SAN JOAQUIN COUNTY <br />?,,, �' o <br />r.' ;.i COMMUNITY DEVELOPMENTAR <br />1610 E HAMTON AVE, STOORON, CA 95205 <br />...0 I'Ody.� DEVELOPMENT SERVICES PHONE (209) 468-3120 <br />PLANNING PHONE 12091 468.3120 <br />BUILOING PHONE 12091 468.3123 <br />NBGHBOR4000 PRESERVATION PHONE 12091 468-3021 <br />BACKFILL EXCAVATION CERTIFICATE <br />Project <br />++Location 23yQ/ S C6/Yt/S/If I ka %l+GN <br />�(- <br />Owner Lk9(. UArJ 'k0PATi>? Phone No.C�pg1 a �SZ//!5-- <br />ContractorALL �NU�l20liti(Briitg I�IkPhone No.�jj le2p32,3_�License No. 6'�yy19 <br />INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br />1. Submission of Soil Engineer's Compaction Report within 30 days of project <br />—/ completion, or <br />2. Submission of verification, e.g. load ticket, within 30 days of project <br />completion that one of the following materials was placed in the excavation in <br />12" lifts: <br />XA. Pea gravel - smooth, rounded material not more than one-half (1/2) <br />inch in diameter. <br />B. Crushed rock - self -compacting material not more than three-quarters <br />(3/4) inch in cross sectional measurement. (Use of crushed rock <br />will not be permitted for backfill if contact will be made between <br />the backfill material and tanks/pipes made of poly resin glass or <br />similar materials.) <br />DECLARATION <br />I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days <br />of project completion, or submission of verification that the select material described above <br />will be placed at a minimum of five (5) cubic yards per 1000 gallon tank displacement and <br />that the entire excavation will be backfilled and compacted to insure compliance with the <br />Uniform Building Code Appendix Chapter 70. <br />* <br />* .��m)n�1r-�rL �oU_MCT-' <br />Name (Print) <br />shall be the responsible managing employee on the license or authorized <br />agent. <br />6/91-LC/SECERT.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.