Laserfiche WebLink
12 Handling of excavated soil• <br />a) What material will be used to line and cover the tank & piping stockpile placed on the ground? <br />Visqueen under and over the stockpiles. <br />b) What will be the disposition of the tank & piping stockpile after analysis? <br />Used as backfill, if clean results from the -laboratory are obtained. <br />13. What is the depth to groundwater? <br />18.0 feet. <br />Describe the source of information: <br />Recent drilling job by IT Corporation. <br />14. Are there any wells on this parcel or adjacent properties? YES [I NO [ <br />TYPE OF WELIS <br />DISTANCE TO TANKS(S) <br />Public Well <br />ft <br />Private Well <br />ft. <br />Irrigation Well <br />R <br />Monitoring Well <br />ft. <br />Other <br />15 ft. <br />15. Will the tank(s) pending closure be replaced with an aboveground or underground storage tank(s) and has the <br />responsible party submitted a 'Letter of Commitment to PHS/EHD? <br />No replacement is planned. <br />Page 6 <br />dosplan (Rev 4/22/91) wp <br />