Laserfiche WebLink
8. a. Describe the method that will be utilized to purge and/or inert the tank(s): J� ,Y* UO <br />b. Tank/Piping Hauler. <br />Address City Zip <br />Phone Nod 1 <br />Hamer Registration # (if hauled as hazardous) <br />C. Tankimping Disposal Site: <br />M <br />Address ' City. Zip <br />Phone No.( ) <br />FPA H» (if transported to a permitted TSD facility) <br />9. Describe, in detail, how the soil and/or water sample(s) beneath the tank and piping will be obtained- <br />.,;, \\ <br />btained:w,\\ 3 c 400 4- —D,- Sk <br />t o S l Ye�m vll <br />i <br />10. Describe how the excavation will be backfilled with suitable material upon removal: <br />11. Handling of excavated soil: <br />a) What material will be used to Hoe the tank pit and cover the stockpile? <br />b) What will be the final destination of the excavated stockpile? <br />U <br />c) Contaminated Soil Hazardous Waste Hauler. VI r Gwy kw "Z / W�v waj A At j <br />Mmkr Reffisiradoa jl� <br />Address City Zip <br />Phone No.( 1 <br />Page 5 <br />