My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1993
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
800
>
2300 - Underground Storage Tank Program
>
PR0231063
>
REMOVAL_1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:48 AM
Creation date
11/2/2018 5:28:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1993
RECORD_ID
PR0231063
PE
2381
FACILITY_ID
FA0002715
FACILITY_NAME
NEWARK RECYCLED FIBERS
STREET_NUMBER
800
Direction
W
STREET_NAME
CHURCH
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14523004
CURRENT_STATUS
02
SITE_LOCATION
800 W CHURCH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CHURCH\800\PR0231063\REMOVAL 1993.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OWA <br />1710 Main Street <br />Escalon, CA 95320 <br />Phone: (209) 838-3507 <br />FAX: (209) 838-3509 <br />May 12, 1994 <br />Ms. Pamela Violett <br />San Joaquin County Public Health Services, <br />Environmental Health Division <br />P.O. Box 2009 <br />Stockton, CA 95201 <br />Working To Restore Nature <br />Subject: Newark Sierra Paperboard Corp., 800 W. Church St., Stockton, CA (Plate 1) <br />Dear Ms. Violett: <br />In accordance with our telephone conversation on May 11, 1994, this correspondence presents <br />a letter workplan for piping, vault and sump closure at the subject site. The locations of the <br />vaults and sump are presented on Plate 2. The proposed workscope and methodology for closing <br />the courtyard vaults is outlined below: <br />o The piping located in the vicinity of the vaults and sump will be abandoned by plugging <br />the exposed openings with concrete inserted approximately 2 feet into the pipes and <br />welding steel caps over the ends. <br />O The vaults and sump will be abandoned by backfilling with controlled density fill material <br />(CDF). The material will be pumped into the vaults and sump. Attachment 1 contains <br />the specifications of the CDF. <br />O The concrete rubble generated as a result of opening the vault roofs will be deposited in <br />the vault pit concurrent with placement of the CDF. <br />o Prior to filling the sump with CDF the location of the high pressure underground fire <br />suppression line will be well marked on the sump curbing to facilitate future <br />identification. <br />o Lengths of PVC pipe will be placed vertically into the sump and vaults prior to filling <br />with the CDF material. The pipes will be filled with CDF and left in place to identify <br />safe and unobstructed drilling locations should future drilling be necessary. <br />M:\7 ODIMREPORMWM594. FNL <br />
The URL can be used to link to this page
Your browser does not support the video tag.