Laserfiche WebLink
iz-FINAL-TNSPECTION APPROVALS AND CERTIFICATE OF OCCUPANCY <br /> CITY OF LODI CCMMUNITY DEVELOPMENT DEL 4ENT BUILDING INSPECTION DIVISION, 221 W P STREET, PO BOX 3006, LODI, CA 95241-1910 <br /> r -- <br /> Application No • 10849 Application Date: 9/01196 Permit Date: 1/30/97 Permit No.: 30070 <br /> Jab Address: 820 S CLUFF AV Assessor Parcel No.: 49-070-0054 Subdivision: Lot No.: <br /> Property Owner: LODI UNIFIED SCHOOL DISTRI2. CAPITAL FACILITIES CORP Phone No: <br /> Mailing Address: 1300 W LORI AVE City/State: LODI CA Zip Code: 95242-0000 <br /> Permit Class: NEW CONSTRUCTION Permit Types: BLDG ELEC PLMB UBC Group: UBC Type: <br /> Project Description: INSTALLATION OF ABOVE GROUND FUEL TANKS/1-6000 GAL/1-20,000 GAL - AT THE LUSD BUS FACILITY <br /> Project Manager: DAVID SCHULETER Subs (Y/N): Phone No.: 209-331-7218 <br /> Contractor: WRIGHT ENVIRONMENTAL SERVICES INC License No.: 651501 Phone No.: 209-833-0758 <br /> Address: 4220 CCM4ERCIAL DR #5 City/St: TRACY CA Zip: 95376-0000 <br /> Lender Name: Address: <br /> INSTRUCTIONS <br /> Please Note: This form must be completed and returned to the Building Inspection Division BEFORE a final inspection by the Building <br /> Division will be Scheduled. Permitee is responsible for obtaining the following approvals: <br /> FIRE DEPARTMENT 333-6739 BY: J / DATE: <br /> PUBLIC WORKS DEPT 333-6706 BY: //fi/ /�� ` DATE: <br /> -��� - <br /> WATER/WASTEWATER 333-6740 BY: ��';� � < DATE: <br /> BUILDING INSPECTION 333-6714 BY: DATE: <br /> BUILDING OFFICIAL: ROGER G. HOUSTCN <br /> This Certificate is issued pursuant to the requirements of Section 308 of the Uniform Building Code; certifying that at the time of <br /> issuance this structure was in compliance with the various ordinances of the City of Lodi regulating building construction or use. <br /> The Building Inspection Division shares your desire to complete the final inspection phase of your project in an expeditious manner. <br /> However, prior to approval of final inspection, and authorization of gas service connections, the builder is responsible for <br /> contacting the Departments listed above and obtaining final unconditional approval from the agency or City Department. <br /> The Building Inspection Division will schedule a final inspection when the appropriate approval signatures have been secured and <br /> this form has been returned to the Building Inspection Division. <br /> White & Yellow - Return to Building Division with required signatures Pink - Builder <br />