Laserfiche WebLink
SECTION G.0 WORK ZONES <br /> The work zones will be determined by the Project Manager and the Site Safety Officer before the <br /> start of operations. <br /> SECTION 7.0 GENERAL PROJECT SAFETY REQUIREMENTS <br /> 7.1 GENERAL SAFETY <br /> Personnel must remain alert to any potential hazards such as slippery surfaces, <br /> overhead lines, faulty equipment and tripping. <br /> Field personnel should be alert for any unsafe conditions that may arise on site. All <br /> observations must be reported immediately. Personnel must observe each other for <br /> signs of heat stress mentioned earlier. <br /> SECTION 8.0 SANITATION <br /> 8. 1 DRINKING WATER <br /> An adequate supply of potable water is provided on the site. Any container used to distribute <br /> drinking water shall be clearly marked as to the nature of its contents and not used for any other <br /> purpose. <br /> 8.2 TOILET FACILITIES <br /> Toilets are provided for employees according to 29 CFR 1910 Table H-120.2. <br /> Toilet facilities are located on site in the bus maintenance facility. <br />