Laserfiche WebLink
File MM19409 Vol. 1 Sec. 1 ILL-9l Page 1) Issued:1996-05-29 <br /> And Report <br /> f <br /> MANUFACTURING PROCESS(DOUET,F.-WALL TANK SUMPS) <br /> Stop l) Load tied,FRP io aad usek <br /> SIep2). String fiberglass strands to bath and guide. <br /> Slep3). Wrap soandlcl%ilb mylar. ls...�aVrR �-•" <br /> Stepd). Mmsure out rcslrJhasdnw rotwsinto santdrwent vessels. SEP 14 2016 <br /> Step S). Seta+nding apeed and lay-up cnumer or.filament winding mathin� s�nrej�ha_ <br /> Step 6). (74Wyn 2-3 gallons ofnsin material d <br /> Step�. Pour resin material into hath ruehmr. Prepare additionol2-3 Sallosta of •, <br /> resin material ibr calalyzation. <br /> Step 8). Starttuschina. <br /> &tap 9). During roWion•squeegee access resin nnueritl from nusakd into <br /> contain as resin la apples, Return recess ralntn bath receiver. <br /> Step 10) Yuually inspect mndsel length during,winding pnxedum for correct <br /> £lament alignment,dalamltation%resin contact,sir bubbles and maintain <br /> hath reeeivcr resin level. <br /> Step ll). tlbswterantar. FJ&ypeaseaorcyckafttt36 ftLNA )2in.dlasneter <br /> sumps,nia (y passes or cycles for 48 err diarietawmp. Psrt ihicl3tess <br /> 3116 in,200 trials nominal. <br /> Step 12). Cut st.•aads,continue snondnel rousionaad squee6ee for 10 mia. <br /> Step 13). Rotate mardml umil cur cd. Stop mandrel, <br /> Step 14). Yswal Inspection of part for any defects or incluxirtda{tx <br /> Step 15). Rotate mandrel and arribe part for camp length svldng afterranoyat <br /> Step 16). Attach removal apparatus and remuvc, <br /> Step 17). (art on&aibo maks: <br /> Step 18). Sand puna auriko:of sump body.Wd out and apply(Ayer of Parabeam <br /> cloth(or equiu'alent). Let cure. <br /> 0040040342 <br />