My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2015 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1340
>
2300 - Underground Storage Tank Program
>
PR0529124
>
COMPLIANCE INFO_2015 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2022 2:22:42 PM
Creation date
11/2/2018 5:38:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015 - 2018
RECORD_ID
PR0529124
PE
2351
FACILITY_ID
FA0019437
FACILITY_NAME
ARCO am/pm # 83230
STREET_NUMBER
1340
Direction
W
STREET_NAME
COLONY
STREET_TYPE
Rd
City
Ripon
Zip
95366
APN
261-590-110-000
CURRENT_STATUS
01
SITE_LOCATION
1340 W Colony Rd
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\COLONY\1340\PR0529124\COMPLIANCE INFO 2016 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
10/26/2016 3:50:54 PM
QuestysRecordID
3092866
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File MM19409 Vol. 1 Sec. 1 ILL-9l Page 1) Issued:1996-05-29 <br /> And Report <br /> f <br /> MANUFACTURING PROCESS(DOUET,F.-WALL TANK SUMPS) <br /> Stop l) Load tied,FRP io aad usek <br /> SIep2). String fiberglass strands to bath and guide. <br /> Slep3). Wrap soandlcl%ilb mylar. ls...�aVrR �-•" <br /> Stepd). Mmsure out rcslrJhasdnw rotwsinto santdrwent vessels. SEP 14 2016 <br /> Step S). Seta+nding apeed and lay-up cnumer or.filament winding mathin� s�nrej�ha_ <br /> Step 6). (74Wyn 2-3 gallons ofnsin material d <br /> Step�. Pour resin material into hath ruehmr. Prepare additionol2-3 Sallosta of •, <br /> resin material ibr calalyzation. <br /> Step 8). Starttuschina. <br /> &tap 9). During roWion•squeegee access resin nnueritl from nusakd into <br /> contain as resin la apples, Return recess ralntn bath receiver. <br /> Step 10) Yuually inspect mndsel length during,winding pnxedum for correct <br /> £lament alignment,dalamltation%resin contact,sir bubbles and maintain <br /> hath reeeivcr resin level. <br /> Step ll). tlbswterantar. FJ&ypeaseaorcyckafttt36 ftLNA )2in.dlasneter <br /> sumps,nia (y passes or cycles for 48 err diarietawmp. Psrt ihicl3tess <br /> 3116 in,200 trials nominal. <br /> Step 12). Cut st.•aads,continue snondnel rousionaad squee6ee for 10 mia. <br /> Step 13). Rotate mardml umil cur cd. Stop mandrel, <br /> Step 14). Yswal Inspection of part for any defects or incluxirtda{tx <br /> Step 15). Rotate mandrel and arribe part for camp length svldng afterranoyat <br /> Step 16). Attach removal apparatus and remuvc, <br /> Step 17). (art on&aibo maks: <br /> Step 18). Sand puna auriko:of sump body.Wd out and apply(Ayer of Parabeam <br /> cloth(or equiu'alent). Let cure. <br /> 0040040342 <br />
The URL can be used to link to this page
Your browser does not support the video tag.