My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2015 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1340
>
2300 - Underground Storage Tank Program
>
PR0529124
>
COMPLIANCE INFO_2015 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2022 2:22:42 PM
Creation date
11/2/2018 5:38:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015 - 2018
RECORD_ID
PR0529124
PE
2351
FACILITY_ID
FA0019437
FACILITY_NAME
ARCO am/pm # 83230
STREET_NUMBER
1340
Direction
W
STREET_NAME
COLONY
STREET_TYPE
Rd
City
Ripon
Zip
95366
APN
261-590-110-000
CURRENT_STATUS
01
SITE_LOCATION
1340 W Colony Rd
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\COLONY\1340\PR0529124\COMPLIANCE INFO 2016 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
10/26/2016 3:50:54 PM
QuestysRecordID
3092866
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR SEP 1 4 ?Ulb <br /> (Submit minimum of 3 sets of plans 8 applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES t j NO[] <br /> 2. Submit copies of Icc Service Technician and/or Installer's certificate and 911 manufacturer <br /> training <br /> �n tcertificates <br /> H�I ht and Safety <br /> person installing or testing any component that is repaired or replaced. 'Ensure a copy <br /> Plan'is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing Dation of repairs and/or replacements. If repairing a component,describe Mow this will be done. (If <br /> addin piping, UDC's, or other UST equipment, or performing tank top upgrade, use the /1ST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Brake-out concrete and repair the existing man-way lid on 87-unleaded fill sump-raising <br /> Install new reducer boots,band clamps,inner sump li6s and sump gaskets on the 87- <br /> 4. List of equipment to be use (Attach manufacturer's specification sheets showing third-party approval) <br /> 7.Franklin Fueling WTR-1019 reducing buts with camp,4-(87)unleaded sump 2-(91)Premium sump 1-Diesel sump <br /> king,hold dawns,nuts,end screws-al§three sumps <br /> 3.Western Fibergiass type D gaskets kit-cau <br /> 3.Western Fiberglass custom lids partNOW42aCT-56B33PT-all three sumps <br /> 1.western Fiberglass custom fit sump shield part#TAL-MTP.unleaded sumps <br /> 1.Western Fiberglass Retrofit kit Riser Reducer Type B ParV1 TA9985 unleaded sump <br /> 7 <br /> EH230036(11+v1eed 12-11-16) <br />
The URL can be used to link to this page
Your browser does not support the video tag.