Laserfiche WebLink
• <br /> MONITORING SYSTEM <br /> Authori 1<or i"I,ve B CERTIFICATION <br /> ty Cited. Chapter 6 7 Hecahh Sa eJPf riselictions Within the State of Ccrl for?ria <br /> } ty Code; Chapter Id piviyj n 3, Title 23, California Code o <br /> This form must be used to document testin <br /> f r each monitarin s stem control Ics by the techs;g and servicing <br /> who monitoring of f Rei,�rlatio��s <br /> system awner/operator, The ownerlo eratar must submit a co equipment se._Darate ce,tcai or re ort must be are ared <br /> p performs the work. A copy of this form must be provided to the tank <br /> days of test date. copy of this form to tate local agency regulating UST <br /> A. General Information systems within 30 <br /> Facility Name. Sprint Stockton <br /> Site Address: 3807 Coronado Ave <br /> Bldg. <br /> Facility Contact Person: Daye ��~1��--�-- City: Stockton !� <br /> Make/Model of Monitoring ~~ —_�_ Contact Phone No.: (217 )tab3.9440 <br /> t;S ystem: Veeder-Root TLS 3000 <br /> B' <br /> Inventoryof Equipment Tested/Certified <br /> of Testing/Servicing: !l /7/2014 <br /> Cheek thea ro Mete bows to indicate s ecific e Uj <br /> Tank ID: Diesel AST 5000 Gal mart U' `U <br /> g °C "er'tced: <br /> 10 In-Tank Gauging Probe, Tank ID: <br /> []Annular Space or Vault Sensor. Mode]: Mag] <br /> mFi rn Sum Model: 794390-420 ❑ In-Tank Gauging probe. <br /> P g s p/Trench Sensor(s). Model 7943$0.208 Ll Annular Space or Vault Sensor. Model: <br /> ❑ Fill Sump Sensor(s). ❑ Pim Model:z z, <br /> ❑ Mechanical Line Le Model: �— Piping Sump/']rr}t Sensor(s). Model: <br /> ❑ Electronic Line Leak Detector,, Model: ❑ Fill Sump Scnsor{s). <br /> Model,~` ❑ Mechanical Line Leak Detector. Model: <br /> �JTank Ovorlil]/High-Level Sensor. M `~ ❑ Electronic Line Leak Nfodel: <br /> 0 Other(sped -equipment oriel:Flapper/V-R Ext Alarm Deterxor. Model: <br /> Q Pment type and model ut Section E on Page 2). L❑7 T�overfill/High-Level Sem. Model: <br /> T anis ID: Diesel UST 10000 Gal other(specif eq meat <br /> ©ln-Tank Gauging Probe. Tank @: a^d tEtodel in Section E Po an ge 2). <br /> ®Annular Space or Vault Sensor. Model: Ma 1 In-Tank-'Gauging <br /> ©Piping Sttmp/Trench SensorModel: 71438U-302(Brine} Prob,�. —— <br /> ❑ Fi11 Sump Sensor (s) Model:794380-208 Q Annular Space or Vauh Sensor. Model: <br /> ❑ Mechanical Line Model: ❑ Piping Sump/Trench Samsor(s). Model: <br /> Electronic Line Leak Detecor. Model: ❑ Fill Sump Sensor(s). <br /> ❑ Mechanical Line tlodel:~—��- <br /> ©Tank Overfill/Hi Model: _�_� -- Leak Detector I-I{odcl:High-Level Sensor,Level Sensor, Model:Fla Cl Electronic Line leak Detector. <br /> ❑ Other{specify e4wpment a and peer/V-R Ext Alarm ❑ Tank Overf l]/High_�1 Mode]: <br /> ��sodel in Section E on Page 2). p O 5cgsar Mode[- <br /> Sump ID;AST Trans sump that(specify aqui and mrx�e!in Sectio-- n E on Page 2}� <br /> ❑ Sump Containment Sensor(s). Model: 794380-208 Dispenser ID: <br /> ❑ Shear Valve(s). — ❑ Dispenser Contaiarnrru <br /> ❑ Dispenser Containment Floats}and C�iairt(s) ❑ Shear Valve(n Sm`�(s) Me&l:Dispenser ID: ❑ Dis �~~~` <br /> parser Containmcot it7oat(s)and Chain(s). <br /> V <br /> LI Dispenser C011 Ainment Sensor(s), Model Dispenser ID: <br /> ❑ Shear Valve(s). ` <br /> ❑ Dis enser Containment Floa(s)and Chain(s), Q Dispenser Containment Sen <br /> ❑ Shear Valvc(s). <br /> Dispenser 10: ❑ Dispenser Containment Float s - <br /> ❑ Dispenser Cont ' - ( ) Chain(s). <br /> oatmeal Sensor(s). Model: Dispenser ID: _ <br /> ❑ Shear Valvc(s)_ —� ❑ Dis <br /> ❑Dispenser Con —`� Dispenser Cont$irunent Sensor(s). Model: <br /> taiwncnt Float s)and Chain(s}. L3 Shear Valve(s). <br /> *If the facility contains more tanks s ❑ Disponser Containment Float(s)and Cbain(s), <br /> or dispensers,copy this form. Include iormatian for eve <br /> C. Certification - I certif every tank and dispenser at the facility. <br /> y that the equipment i identified in this doctement was inspected/serviced in accordance with the manufacturers, <br /> guidelines. Attached to this Certification is intonation e, , <br /> correct and a Plot plan showing the layout of rnonitorin e <br /> ( g manufacturers checklists) necessary to verify tars' <br /> attached a copy of the report;(check all that apply) g 9Uipment. For an equipment ca able of that this information is <br /> Technician tJatne tint :P pP vl' x System s yF generating such reports,I have also <br /> (p ) peter Jauregui III larm history report <br /> Signature: <br /> Certification No.: 1334641 <br /> Testing Company Name: Li&Culver inc. Li se. No,:_70$231 <br /> Site Address: 959 W. mission Ave Escondido CA 920.25 ~— Phone No.: 760 <br /> ( ) 743-05I8 <br /> Date of Testing/Servicing:J I_/ 2014 <br /> 7 <br /> Monitoring System Certification Page I of 3 <br /> 0310I <br />