My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1994
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
3807
>
2300 - Underground Storage Tank Program
>
PR0231066
>
INSTALL_1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:36 AM
Creation date
11/2/2018 6:14:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1994
RECORD_ID
PR0231066
PE
2361
FACILITY_ID
FA0003819
FACILITY_NAME
Sprint United Managemnt Co.
STREET_NUMBER
3807
STREET_NAME
CORONADO
STREET_TYPE
Ave
City
Stockton
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
3807 Coronado Ave
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\CORONADO\3807\PR0231066\1994 INSTALL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM PRINTSET INFORMATION • <br />• <br />1. Four complete sets of plans (To include specification sheets and/or equipment brochures if not on file). <br />2.y��tans drawn to scale in non -erasable print. <br />3• /Plot plan to show location and number of tanks. <br />4• _� Tank cross-sectional diagram included on prints submitted. <br />5. Detail of tank, piping system, excavation and cover. <br />6• Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Subchapter 16, <br />rficle 3, Sec. 2631 (r) & 26351 <br />7• Verification of product compatibility with the tank(s), piping, monitoring <br />device(s), epoxy or silicone glues, etc. [Section 2635 (b) (2)] <br />Manufacturers written installation instructions for tank(s), piping, monitoring devices, etc. [Section 2635 (b) (5)] <br />9• Tightness Test (NFPA 30) is required on both primary (10) and secondary (20) contairment systems before covering. <br />[Section 2635 (b) (6) & (7)] <br />10. ✓ Double walled tanks using pressure or vacuum testing to monitor the annular space. [Section 2635 (b) (7)] <br />11. NFPA 329 "Precision Test" required upon completion of installation with tank in operating condition. Test results to <br />be submitted directly to PHS/END from the testing company or owner of facility. [Health & Safety Code, Division 20, <br />Chapter 6.7, Section 25291 (g)] <br />12. TANK COMPMITTM <br />TANK # <br /># / <br /># <br />CAPACITY <br />MANUFACTURER <br />?( <br />COMPOSITION <br />MODEL <br />PRODUCT <br />CORROSION PROTECTION <br />U.L. LISTED <br />COMPATIBILITY WITH 100% <br />METHANOL <br />13. TANK(s) TO BE INSTALLED <br />A. Steel -clad with fiberglass reinforced plastic. <br />_ B. Holiday test required immediately before "setting" tank(s) (35,000 - 40,000 volts). (Section 2635 (b) (4)] <br />C. Fiberglass [Sections 2635 (3) and 2631 (p)] <br />(1) Striker plate dimensions and materials. <br />(2) Striker plate under all accessible openings. <br />✓ (3) Installation instructions require an air test and soap bubble test prior to installation. <br />D. Non -clad steel tank [Section 2635 (b)] <br />(1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />(2) Approved by a corrosion engineer or N.A.C.E. technician. <br />(3) Document stating inspection method and fre=quency (minimussemi-annual inspection requirement). <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.