Laserfiche WebLink
BACKFILL EXCAVATION CERTIFICATE <br />Project LocationVbgU e0a244c_ f 0L4^LJ F 0, %j4AC (J4 <br />Owner Ac/4 - Awo Phone No.y <br />Contractor SLT9C0 Phone No. (209) 524-9653 License No. 449064 <br />INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br />1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br />2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was <br />placed in the excavation in 12" lifts: <br />,y, A. Pea gravel—smooth, rounded material not more than one-half (1/2) inch in diameter <br />B. Crushed rock—self-compacting material not more than tbree-quarters (3/4) inch in cross sectional <br />measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between the <br />backfill material and tanks/pipes made of poly resin glass or similar materials.) <br />DECLARATION <br />I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days ofpproject completion, or submission of <br />verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br />displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br />Appendix Chapter 70. <br />* PA(Lic- D2EcvK <br />name lmnt/ <br />q ENT <br />/te t <br />— sign[ <br />* Shall be the responsible managing employee on the license or authorized agent. <br />