Laserfiche WebLink
Q <br />It <br />o� <br />Fw9 <br />O <br />--- <br />--- - _----------------- <br />PERFORMANCE SPECIFICATION <br />0 <br />n <br />SECTION I GENERAL CONDITIONS <br />SEC <br />F <br />> I O N i GENERAL CONDITIONS - CONTINUED� <br />SECTION <br />i GENERAL CONDITIONS - CONTINUED- <br />-�_ <br />d <br />__. <br />¢ <br />z <br />PART I <br />-- GENERAL_ <br />PART 4 <br />- RESPONSIBILITY OF THE CON -TRACTOR - CONTINUED <br />PART <br />7 - COMPLETION OF CONTRACT - CONTINUED <br />�LuPE OF WORK THE WORK INCLUDED IN THE CONTRACT FOR THIS PROJECINSPECTIONS. <br />z <br />CONTRACTOR SHALL BEREQUIRED TO ADHERE 10 LI. HE)18 MFN S OF <br />0 <br />1 2 FIXED PARTS OR MEMBERS SHALL BE SEr EL FIGHT IN PLACE, FREE E FROM <br />CONSISTS OF THE FURNISHING OFALIAE0k, MATERIALS, SERVICES, EOUIPMEN AND <br />U <br />OWNERS INSPECTION PROGRAM. CONTRACTOR SHALL COMPLY WITH REQUIREMENTS FOR <br />DISTORTIONS. <br />U <br />V) <br />APPLIANCES REOUIRED IN CONJUNCTION WITH OR PROPERLY INCIDENTAL TO THF COMPLETE <br />NOTIF"ICATION, SITE PREPARATION REQUIREMENTS, COMPLIANCE, ON -SHE PRESENCE DURING <br />�2.3 <br />j(C <br />C <br />Y J <br />r r <br />U <br />3 n <br />FINISHES SHALL BE FREE FROM BUBBLES, STREAKS, PEELING, PITS OR OTHER <br />CONSTRUCTION OF A GASOLINE INSTALLATION FOR THE sOUrHLANU CORPORATION <br />INSPECTION AND CORRECTION OF ANY DEFECTS OR RELATED PROBLEMS AS DIRECTED BY <br />IRREGULARITIES. EXCEPT WHERE ROUGH MATERIALS MAY BE REQUIRED. <br />v <br />h O O <br />1 N <br />m <br />m Q <br />m Z <br />p <br />FINISH <br />RT 2 <br />- AGREEMENT <br />INSPECTING REPREDENHVF. CONTRACTOR SHALL. PROVIDE NO LESS THAN 48 HOURS NOTICE <br />z z <br />O <br />SURFACES SHALL BE. FREE FROM DIRT GREASE, MASTICS, FI ' <br />EASE, NGERPRINTS, SCRATCHES. <br />1 O <br />W y <br />N U <br />J <br />O <br />a <br />w <br />I n On <br />PRIOR TO INSPECTION <br />I, N� <br />a <br />CONTRACTOR FARM SHALL. BE SOUTHLAND AGREEMENT" <br />CORPORATION "GCATION. <br />r <br />DENTS. CRACKS, STAINS, CHIPS OR OTHER DAMAGING EFFECTS <br />ArcC <br />I <br />(iA40015T. DATED tt/F38 AND RELATED INSURANCE SPECIFICATION. n COPY OF (EFTS CON- <br />48 <br />COORDINATION: GASOLINE CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING AI_L PHASES <br />7 <br />-.3 <br />rLF�1NING <br />TRACT IS AVAILABLE THROUGH i_OCAI. CONSTRUCTION OFFICE OR SITE MANAGER FOR REVIEW <br />_ <br />OF THE GASOLINE INSTALLATION WITH THE, GENERAL CONTRACTOR IN CHARGE OF THE <br />7.3-i ALL WORK <br />BUILDING OR MAJOR PORTION OF THE PROJECT THE BUILDING GENERAL CONTRACTOR AND <br />SHALL BE CLEAN AND READY FOR USE UPON COMPLETION REMOVE <br />PAGE ARTICLE II - OWNER WHENEVER THE WU2"J "OWNER" APPEARS IN TtC <br />THE GASOLINE CONTRACTOR SHALL JOINTLY DEVELOP A MUTUALLY AGREEABLE SCHEDULE <br />- TEMPORARY TAPES WRAPPING, CDATI NG, PAPER LABELS AND OfHER ITEMS <br />S. <br />CONTRACT DOCUMENTS. DRAWINGS AND SPECIFICATIONS, IT SHALL BE DEEMED TO READ <br />O <br />AND TIMETABLE FOR COMPLETION ON THE GASOLINE INSTALLATION. TIMETABLE FOR BUILDING <br />732 CLEANING METHODS FOR PROPRIETARY MATERIALS SHALL BE IN STRICT ACCORDANCE <br />'THE: SOUTHLAND CORPORATION." <br />AND GASOLINE SHALL COINCIDE AND COMPLIMENT EACH OTHER SO THAT ONE DOES NOT <br />WITH MANUFACTURER'S INSTRUCTIONS. CLEANING SOLUTIONS, AGENTS. SOLVENTS, WAXES <br />2 3 <br />PAGE 3 -- ARTICLE III - CONTRACTOR WHENEVER THE WORD "CONTRACTOR" APPEARS <br />DELAY THE OTHER <br />OR OTHER MATERIALS SHALL BE ONLY AS APPROVED BY THE MANUFACTURER OF THE <br />IN THE CONTRACT DOCUMENTS, DRAWINGS AND SPECIFICATIONS, IT SHALL BE DEEMED TO <br />MATERIAL INSTALLED IN THE WORK. <br />READ "GENERAL GASOLINE INSTALLATION CONTRACTOR ' <br />153 CLEAN-UP: CONTRACTOR SHALL CLEAN UP ALL DEBRIS CAUSED BY THE 'WORK OF <br />SHOULD GASOLINE CONTRACTOR FAIL TO MEET DEADLINES AS ESTABLISHED BY THE <br />PART 3 <br />--- INTENT OF DRAWING AND SPECIFICATIONS <br />SCHEDULE AND/OR HOLD UP THE COMPLETION OF THE OVERALL BUILDING PROJECT, <br />HIS SECTION, KEEPING THE PREMISES NEAT AT ALL TIMES. <br />31 <br />THE INTENT OF THE DRAWINGS AND SPECIFICATIONS IS TO PRESCRIBE: A COMPLETE <br />SOUTHLAND CORPORATION RESERVES THE RIGHT TO RECTIFY THE SITUATION ACCORDINGLY <br />PART <br />B - CODES <br />WORK OR IMPROVEMENT WHICH THE CONTRACTOR UNDERTAKES f0 DO IN FULL COMPLIANCE <br />49 <br />CONTRACTOR SHALL PROVIDE OWNER WRITTEN CERTIFICATION AS TO THE FOLLOWING: <br />8 I <br />THE FOLLOWING CODES ARE MADE A PART OF THIS SPECIFICATION SAID CODES SHALL <br />WITH THE CONTRACT DOCUMENTS THE CONTRACTOR ;HALL DO ALL WORK. AS MAY BE <br />4.7.1 CERTIFICATION FROM LOCAL/STATE GOVERNING AUTHORITIES AS APPLICABLE FOR <br />DICTATE MINIMAL ACCEPTABLE STANDARDS. CODE SHALL BE ADHERED TO UNLESS LOCAL <br />NECESSARY TO COMPLETE "THE WORK IN A SATiSFACIORY AND ACCEPTABLE MANNER <br />CONTRACTOR CERTIFICATION/LICENSING FOR INSTALLATION OF GASOLINE STORAGE <br />GOVERNING AUTHORITIES DICTATE HIGHER OR MORE STRINGENT REQUIREMENTS WHICH <br />S2 <br />THE CONTRACTOR SHALL. UPON DISCOVERY, REPORT ANY DISCREPANCIES IN THE <br />TANK SYSTEM <br />SHALL TAKE PRECEDENCE: <br />DRAWINGS AND SPECIFICATIONS TO THE OWNER'S CONSTRUCTION MANAGER. <br />4.9.2 CERTIFICATION FROM EQUIPMENT MANUFACTURES AND SUPPLIERS (TANKS, <br />8.1.1 NEPA .30 FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE <br />5 S <br />rHE DRAWINGS AND SPECIFICATINS ARE INTENDED TO HE COMPLIMENTARY ANYTHIN(, <br />PRODUCT LINES, GTM'S, ETC.) AS TO ATTENDING AND ACHIEVING CERTIFICATION <br />8.1.2 PEI MANUAL "RECOMMENDED PRACTICES FOR INSTALLATION OF UNDERGROUND <br />MENTIONED IN THE SPECIFICATIONS AND NOT SHOWN ON THE ORWAINGS, OR SHOWN ON THE <br />FROM APPROPRIATE COMPANY FOR INSTALLATION OF EQUIPMENT. <br />LIQUID STORAGE SYSTEMS." (SRP -100-87 (OR LATEST EDITION) <br />DRAWINGS AND NOT MENTIONED IN THE SPECIFICATIONS, SHALL BE OF LIKE EFFECT- AS IF <br />` <br />4,3 .3 CERTIFICATION ON APPROPR FORMAT AS TO INSTALLATION OF COMPLETE <br />PART <br />9 - WARRANTY / GUARANTEE <br />SHOWN OR MENTIONED IN BOTH. GENERALLY, THE SPECIFICATIONS DESCRIBE WORK NHICH <br />IN <br />SYSTEM BEING PERFORMED N COMPLIANCE WITH ALL LOCAL, STATE AND FEDERAL_ <br />9.1 <br />EXCEPT WHERE SPECIAL GUARANTEES ARE REQUIRED M EXCESS OF ONE. (1) YEAR, ihFE <br />Q <br />CANNOT BE READILY IDENTIFIED ON THE DRAWINGS AND INDICATED TYPES, QUALITIES AND <br />LAWS AND REGULATIONS <br />CONTRACTOR AGREES TO REPAIR OR REPLACE: ANY DEFECT IN MATERIAL OR WORKMANSHIP <br />METHODS OF INSTALLATION OF THE VARIOUS MATERIALS AND EQUIPMENT REQUIRED FOR <br />(BEYOND ORDINARY WEAR AND TEAR) TO THE SATISFACTION OF THE OWNER'S CONSTRUCTION <br />THE WORK IT IS NOT INTENDED TO MENTION EVERY ITEM OF WORK IN THE SPECIFICATIONS <br />4.3.4 CERTIFICATION THAT ALL EQUIPMENT EITHER SUPPLIED BY OWNER OR CONTRACTOR <br />HAS BEEN INSTALLED AS PER MANUFACTURER'S SPECIFICATIONS BY PERSONNEL. <br />DATE: 15JUL97 <br />MANAGER FOR A PERIOD OF ONE (1) YEAR AFTER DATE OF ACCEPTANCE, WHETHER IN HIS <br />WHICH CAN BE ADEQUATELY SHOWN ON THE DRAWINGS NOR SHOW ON THE DRAWINGS <br />3027.20 <br />WORK OR IN THAT OF SUBCONTRACTOR'S, WITHOUT COST TO THE OWNER, <br />DRAWN: MSP <br />F <br />ALL ITEMS OF WORK DESCRIBED OR REQUIRED BY THE SPECIFICATIONS EVEN IF THEY ARE <br />TRAINED AND QUALIFIED FOR THAT SPECIFIC ITEM. <br />APPROVED: CL -- <br />OF SUCH NATURE THAT THEY COULD HAVE BEEN SHOWN THEREON. <br />4.10 <br />PAYMENT SHALL BE MADE PER ARTICLE 1113,2 OF THE CONTRACT <br />PART <br />10 - AS BUILT PLAN AND DOCUMENTATION <br />4.11 <br />LIENS' CONTRACTOR SHALL PERMIT NO LIENS OF ANY KIND TO BE FIXED UPON OR <br />10.1 <br />UPON COMPLETION OF PROJECT, CONTRACTOR SHALL PROVIDE "AS -BUILT SITE PLAN" <br />AGAINST THE PROPERTY N BY ITSLABORE S, MECHANICS 0R MATERIALMEN, AND SHALL <br />V Z FYONG FINAL LOCATION OF INCLUDING, BUT NOT LMI TED TO, <br />ALL MATERIALS OR LABOR FOR WORK WHICH 15 sHow NON THE DRAWINGS OR IS <br />INDEMNIFY, PROTECT AND SAVE OWNER HARMLESS FROM AND AGAINST ALL SUCH <br />PLUMBING AND ELECTRICAL. <br />INFERABLE AS BEING NECESSARY' TO PRODl1Cf. A FINISHED JOB SHALL BE <br />PROVIDED THE CONTRACTOR WHETHER OR NOT THE WORK IS EXPRESSLY COVERED IN <br />PROVIDED B <br />CLAIMS AND LIENS. <br />10.'2 <br />CONTRACTOR SHALL. KEEP PHOTOGRAPHIC JOURNAL OF ALL PHASES OF THE COMPLETE <br />IC <br />TUE SPECIFICATIONS <br />4 12 <br />EQUIPMENT RESPONSIBILITY CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING, <br />INSTALLATION. PHOTOGRAPHS ARE TO BE PROPERLY DATE[), IDENTIFIED AND FORWARDED <br />RECEIVING, UNLOADING, HANDLING AND PROVIDING PROTECTED INSIDE STORAGE FOR ALL <br />T ACONSTRUCTIONFFIf- <br />0 LOCAL . OFFICE <br />5a <br />THE CONTRACTOR, SUBCONTRACTORS AND ALL TRADES SHALL EXAMINE THE SITE AND <br />ASCERTAIN EXISTING CONDITIONS PRIOR TO THE START OF THEIR PORTIONS OF THE WORK. <br />OWNER SUPPLIED EQUIPMENT AND MATERIAL. CONTRACTOR SHALL INSPECT EQUIPMENT UPON <br />-THE <br />SECTION <br />II INSPECTIONS /TESTING <br />RECEIPT AND IMMEDIATELY REPORT ANY DAMAGE DUE i0 SHIPPING TO OWNER'S <br />BEFORE ORDERING MATERIALS OR DOING ANY WORK, THE CONTRACTOR SHALT. VERIFY AND <br />_ <br />REPRESENTATIVE. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE DUE TO FAILURE <br />BE RESPONSIBLE FOR THE CORRECTNESS OF ALL MEASUREMENTS AT THE SITE ANY <br />DIFFERENCES 'WHICH MAY BE FOUND BETWEEN ACTUAL DIMENSIONS AND DIMENSIONS <br />TO COMPLY WITH THESE REQUIREMENTS. DISPENSERS SHALL BE PROTECTED WITH SHIPPING <br />PART <br />1 - GENERAL <br />INDICATED ON THE DRAWINGS OR SHOP DRAWINGS SHALT_ BE SUBMITTED TO THE OWNER'S <br />BOXES UNTIL STORE IS TURNED OVER FOR OPENING CONTRACTOR SHALL BE SOLELY <br />1.1 <br />SCOPE: THIS SECTION COVERS THE FURNISHING OF ALL LABOR, SERVICES <br />RESPONSIBLE FOR ADEQUATE AND LOCKED STORAGE OF OWNERS MISCELLANEOUS <br />AND <br />CONSTRUCTION MANAGER FOR CONSIDERATION BEFORE PROCEEDING WITH THE ACTUAL <br />EQUIPMENT AS REQUIRED TO PROVIDE INSPECTION SERVICES OF THE GAS INSTALLATION. <br />DIMENSIONS AND MEASUREMENTS INDICATED ON THE DRAWINGS UNLESS A SUBSTANTIAL ERROR <br />EQUIPMENT, TO INCLUDE GASOLINE CONSOLE, PRIOR TO OPENING OF THE STORE. <br />HAS BEEN MADE. IF SUCH AN ERROR SHOULD OCCUR, IT 'SHALL BE BROUGHT TO THE <br />4.13 <br />GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR FILING OF RECEIVING FORMS AND <br />PART <br />2 - INSPECTIONS <br />ATTENTION OF THE O'WNER'S CONSTRUCTION MANAGER AND RE:SOLvED BEFORE PROCEEDING <br />MISCELLANEOUS CONFIRMATION OF EQUIPMENT RECEIVING INFORMATION AS REQUIRED BY <br />2.1 <br />INSPECTOR: INSPECTIONS / TESTS SHALL BE PERFORMED BY SOUTHLAND LOCAL. <br />WITH WORK <br />LOCAL. CONSTRUCTION OFFICE. <br />CONSTRUCTION DEPARTMENT AND/OR APPOINTED REPRESENTATIVE. <br />s ` <br />THE ORGANIZATION OF SPECIFICATIONS INTO DIVISIONS, SECTIONS AND PARAGPAPHS, AND <br />4 t4 <br />GENERAL CONTRACTOR SHALL PROVIDE ALL PLUMBING, 'WIRING, MATERIAL AND LABOR AS <br />2 2 <br />NOTIFICATION: CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING SOUTHLANWS <br />THE ARRANGEMENT OF THE DRAWINGS ARE NOT INTENDED TO CONTROL THE CONTRACTOR <br />REQUIRED TO INSTALL OWNER SUPPLIED EQUIPMENT- INCLUDE MONIES IN BID PROPOSAL <br />CONSTRUCTION DEPARTMENT' 48 HOURS PRIOR TO REQUESTED INSPECTION <br />IN DIVIDING THE WORK AMONG SUBCONTRACTORS OR IN THE ESTABLISHING THE EXTENT OF <br />FOR INSTALLATION OF OWNER SUPPLIED EQUIPMENT UNLESS NOTED OTHERWISE. <br />2.3 <br />SPILLAGE: SHOULD SPILLAGE OF PRODUCT OCCUR AT ANY PHASE OF INSTALLATION OR <br />WORK TO HE PERFORMED BY ANY TRADE <br />PART 5 <br />- PROTECTION <br />TESTING, LOCAL SOUTHLAND CONSTRUCTION DEPARTMENT AND ENVIRONMENTAL DEPARTMENT <br />DRAWINGS AND SPECIFICA(IONS DRAWINGS, INDICATE GENERAL. DESIGN AND ARRANGEMENTS <br />5.1 <br />CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY LOSS OR DAMAGE CAUSED BY <br />ARE TO BE NOTIFIED IMMEDIATELY, ESTIMATED LOSS OF PRODUCT AS WELL AS ACTION <br />DRAWINGS ARE DIAGRAMMATIC AND ARE :NOT SCALED FOR DIMENSIONS TAKE ALL DIMENSIONS <br />HIM OR HIS WORKMEN TO THE PROPERTY OR EQUIPMENT OF THE OWNER, OR TO THE WORK <br />TAKEN IS TO BE NOTED AND RECORDED. <br />FROM ARCHITECTUAL PLANS AND EQUIPMENT TO BE FURNISHED vERIFY DIMENSIONS IN THE <br />OR MATERIALS OF OTHER CONTRACTORS. CONTRACTOR SHALL MAKE GOOD ANY LOSS. <br />2.4 <br />REPRESENTATIVE: CONTRACTOR AND PLUMBING SUBCONTRACTOR SHALL BE AVAILABLE <br />FIELD _ <br />DAMAGE OR INJURY WITHOUT COST TO OWNER FOR SUCH LOSS OR DAMAGE:. <br />ON SITE DURING TESTING PROGRAMS. FAILURE TO COMPLY WITH THIS REQUIREMENT 'WILL <br />PART 4 <br />- RESPONSIBILITY OF THE CONTRACTOR <br />5.2 <br />CONTRACTOR SHALL PROVIDE AND MAINTAIN SUITABLE TEMPORARY SIDEWALKS, FENCES, <br />RESULT IN ANY CONNECTIONS AND/OR REPAIRS AS REQUIRED BEING PERFORMED BY OWNER <br />AS REQUIRED. COST OF SAID REPAIRS AND/OR CONNECTIONS SHALL BE DEDUCTED FROM <br />4 ' <br />T <br />('ONTRACTOR HEREBY DECLARES HE HAS READ ALL SPECIFICATIONS AND EXAMINED HE <br />LIGHTS, SIGNS OR OTHER STRUCTURES AND DEVICES AS REQUIRED BY LAW, DO NOT <br />CONTRACT AMOUNT AS REQUIRED r0 SATISFY THE SITUATION. <br />DRAWINGS AND THAT HE UNDERSTANDS ALL CONDITIONS <br />OBSTRUCT OR INTERFERE WITH TRAFFIC IN PUBLIC STREETS, ALLEYWAYS OR PRIVATE <br />RIGHT --OF -WAYS. If WORK IS SUSPENDED, KEEP ALL ROADWAYS AND SIDEWALKS IN <br />2.5 <br />PROHIBITED WORK: CONTRACTOR SHALL SCHEDULE `WORK SUCH THAT NO HEAVY <br />4.2 <br />CONTRACTOR HEREBY DECLARES HE HAS VISITED THE SITE AND IS FIMILIAR WITH THE <br />PROPER CONDITION AND PUT AND LEAVE THEM IN PROPER CONDITION AT TERMINATION OF <br />EQUIPMENT IS OPERATING ON SlrE DURING INSPECTION PROGRAMS. NO WELDING OR OPEN <br />CONDITIONS AFFECTING THE WORK. NO ALLOWANCE; SHALL. BE MADE SUBSEQUENTLY ON <br />'WORK. <br />FLAMES SHALL BE ALLOWED ON SITE AT ANY IIME DURING TEST PROCEDURES, <br />BEHALF OF THE CONTRACTOR FOR ANY ERPOR NEGLIGENCE OIN HIS PART. IF IN THE <br />5.3 <br />CONTRACTOR SHALL SEND PROPER NOTICES, MAKE NECESSARY ARRANGEMENTS AND PERFORM <br />2.6 <br />INSTALLATION REPORTS. SHOULD SOUTHLAND OR THEIR APPOINTED REPRESENTATIVES BE <br />PERFORMANCE OF THE CONTRACT, LATENT CONDITIONS AT THE SHE: ARE FOUND TO BE <br />ALL WORK REQUIRED FOR THE CARE, PROTECTION AND MAINTENANCE OF PUBLIC UTILITIES <br />UNA8LE TO BE PRESENT' AT SITE FOR PURPOSES OF FILING ANY INSPECTION REPORTS, <br />MATERIALLY DIFFERENT FROM THOSE INDICATED BY THE DRAWINGS AND SPECIFICATIONS, OR <br />ON AND AROUND THE BUILDING SITE, ASSUMING ALL RESPONSIBILTY AND PAYING ALL COSTS <br />CONTRACTOR SHALT_ BE RESPONSIBLE FOR COMPLETE INSPECTION AND FILING OF REPORT <br />UNKNOWN CONDITION; INHERENT IN WORK SHOWN AND <br />TM <br />FOR 'WHICH THE OWNER MAY BE LIABLE. CONTRACTOR HEREBY DECLARES HE HAS V RIFIED <br />E <br />WITH LOCAL CONSTRUCTION OFFICE, WRITTEN REPORT SHALL INCLUDE PHOTOGRAPHIC <br />ONUOF THELLY <br />TI MANCHAAGERSH <br />SPECIFIED, THE ATTENTION OF THE. OWNER'S CONSTRUCTION MANAGER Sh1ALL. 8E CALLED <br />THE LOCATIONS OF THE EXISTING UNDERGROUND UTILITIES ON SITE PRIOR TO THE START <br />DOCUMENTATION OF ALL PROCEDURES. <br />IMMEDIATELY i0 SUCH CONDITIONS BEFORE THEY ARE DISTURBED <br />OF WORK. CONIFR HEREBY AGREES TO MAKE ARRANGEMENTS FOR AND TO PAY ALL CHARGES <br />2.7 <br />TEST FAILURE: SHOULD SYSTEM FAIL ANY PORTION OF TEST PROGRAM, CONTRACTOR <br />'1 z <br />CONTRACTOR HEREBY DECLARES THAT HE HAS READ AND IS FAMILIAR WITH THE APPLICABLE <br />IN CONJUNCTION WITH THE RELOCATIONS OF EXISTING UTILITIES AS REQUIRED. THE CONTRAC-- <br />SHALL IMMEDIATELY INSTIGATE PROCEDURES AS REQUIRED TO BRING SYSTEM INTO <br />'TOILS REPORT, <br />TOR SHALL BE RESPONSIBLE FOR ANY AND ALL UTILITY EASEMENTS, HOOK --UP CHARGES, TAP <br />COMPLIANCE SHOULD FAILURE OF TEST DUE TO FACILITY WORK REQUIRE EXPENDITURE OF <br />FEES AND SYSTEM DEVELOPMENT FEES AS NECESSARY FOR COMPLETION OF THIS PROJECT. <br />ADDITIONAL MONIES FOR RESCHEDULING AND/OR RETESTING OF SYSTEM, CONTRACTOR <br />CONTRACTOR SHALL- HE RESPONSIBLE FOR STRICTLY ADHERING f0 THE RECOMMENDATIONS <br />5.4 <br />IF ALL OR PART OF THE WORK IS SUSPENDED FOR ANY REASON, CONTRACTOR SHALL <br />SHALL BE HELD RESPONSIBLE FOR COMPENSATION ACCORDINGLY, <br />OF SAID SOILS REPORT FOLLOWING ALL APPLICABLE PROCEDURES NOTED THEREIN. EXISTING <br />PROPERLY COVER OVER, SECURE AND PROTECT ANY PORTION LIABLE TO SUSTAIN INJURY <br />2.8 <br />CLEAN-UP: IN THE EVENT PRODUCT SPILLAGE SHOULD OCCUR DURING CONSTRUCTION <br />WATER TABLE SHALL DETERMINE THE UTILIZATION OF TANK STRAPS AND TYPE OF BACKFILL.. <br />FROM ANY CAUSE <br />OR DURING WARRANTY PERIOD DUE TO WORK PERFORMED BY CONTRACTOR, CONTRACTOR <br />MATERIAL, SHOULD GROUND WATER OR CONTAMINATION BE DISCOVERED DURING TANK. <br />5.5 <br />PRODUCT PROFECFION. CONTRACTOR SHALL PROVIDE ADEQUATE AND SECURE PROTECTION <br />SHALL BE RESPONSIBLE FOR CLEAN-UP AS MAY BE REQUIRED. <br />EXCAVATION, WORK SHALL BE SUSPENDED PENDING REVIEW BY LOCAL SOUTHLAND <br />OF PRODUCT IN TANKS UPON DEUVERLY UNTIL TURNED OVER FOR OPERATION. ALL FILL, <br />2.9 <br />TEST REPORT: UPON COMPLETION OF TESTING PROGRAMS, REPRESENTIVE OF TESTING/ <br />CONSTRUCTION REPRESENTATIVE <br />VENT AND GAUGING CAPS AND/OR OPENINGS SHALL BE SECURED AND PADLOCKED TO <br />INSPECTION COMPANY SHALL BE RESPONSIBLE FOR FILING COPIES OF TANK AND PIPING <br />4 4 <br />CONTRACTOR SHALL REPORT ANY OBJECTION i0 MATERIALS, APPLIANCES, OR METHODS OF <br />PREVENT VANDALISM OR THEFT. <br />TEST/INSPECTION REPORTS WITH LOCAL SOUTHLAND CONSTRUCTION OFFICE OR SITE <br />CONSTRUCTION SHOWN OR SPECIFIED TO THE OWNER'S CONSTRUCTION MANAGER AND OBTAIN <br />PAR,( 6 <br />- SUBSTITUTION OF MATERIALS <br />MANAGER WITH COPY TO JOB SITE. <br />A DECISION BEFORE PROCEEDING <br />PART <br />3 - TANK INSTALLATION INSPECTION <br />6.1 <br />MATERIALS AS .SPECIFIED REPRESENT REQUIRED STANDARDS. SUBSTITUTION MAY BE <br />a 5 <br />PROPOSALS: CONTRACTOR SHALL SUBMIT E31p ON SOUTHIAND FORM -_ <br />PROPOSED IN WRITING WITH ADEQUATE SUPPORTING DATA FURNISHED. USE OF SUBSTITUE <br />3.1 <br />SCHEDULE: CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING SCHEDULE SO <br />"GASOLINE INSTALLATION BID AND <br />MATERIALS IS DEPENDENT ON RECEIPT OF 'WRITTEN APPROVAL FROM OWNER'S APPROVED <br />TANKS ARE TESTED AND SET IN TANK HOLE SAME DAY OF DELIVERY. <br />ESTIMATE FORM " PROPOSALS SUBMITTED ON ANY OTHER FORM SHALL BE REJECTED AND <br />REPRESENTATIVE, <br />J.2 <br />EXCAVATION: ALL EXCAVATIONS SHALL BE COMPLETED WITH BEDDING MATERIAL IN <br />RETURNED PROPOSALS PROPOSALS NOT COMPLETELY AND PROPERLY FILLED OUT SHALL BE <br />PART 7 <br />- COMPLETION OF CONTRACT <br />PLACE AND READY FOR INSTALLATION PRIOR TO TANK DELIVERY. <br />REJECTED. PROPOSALS SHALL INCLUDE MONIES FOR REMOVAL OF ALL EXISTING <br />IMPROVEMENTS AS REQUIRED FOR GASOLINE INSTALLATION. <br />/.I <br />THE CONTRACT SHALL BE CONSIDERED FULFILLED, SAVE AS PROVIDED IN ANY MAINTENANCE <br />3.3 <br />ANCHORS: SHOULD ON-SITE CONDITIONS REQUIRE A WET HOLE TYPE_ INSTALLATION <br />STIPULATIONS, BOND OR BY LAW, WHEN ALL THE 'WORK HAS BEEN COMPLETED WITH FINAL <br />CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE PREPARATION OF CONCRETE <br />•t6 <br />PERMSr CONTRACTOR BE RESPONSIBLE FOR APPLYING AND PAYING ALL <br />APPLICABLE STATE AND LOCAL PERMITS AND APPLICATIONS AS RELATED r0 THIS WORK. <br />INSPECTION AND ACCEPTANCE MADE BY ALL APPLICABLE GOVERNING BUILDING DEPARTMENTS. <br />ANCHORS (DEADMAN) PRIOR TO SCHEDULING TANK DELIVERY. <br />COPIES OF PERMITS AND CERTIFICATES SHALL BE FORWARDED TO LOCAL SOUTHLAND <br />FIRE MARSHALLS OR OTHER JURISDICTIONS. <br />3.4 <br />STRAPS: ON-SITE CONDITIONS REVEAL THE NEED FOR WET HOLE TYPE <br />CONSTRUCTION OFFICE OR SITE MANAGER PRIOR TO COMMENCEMENT OF WORK. FINAL <br />7.2 <br />WORKMANSHIP <br />INSTALLATION, CONITRACTOR SHALL IMMEDIATELY NOTIFY TANK MANUFACTURER AND <br />CERTIFICATION OF ACCEPTANCE BY GOVERNING AU THOT2I TIES SHALL ALSO BE ON FILE <br />7.2.1 <br />SOUTHLAND CONSTRUCTION DEPARTMENT OF SITUATION. SAID NOTIFICATION WILL BE <br />FRAME CORNERS AND JOINTS IN RUNNING MATERIALS OF THE SAME CROSS SECTION <br />WITH LOCAL. CONSTRUCTION OFFICE OR SITE MANAGER PRIOR TO THE PROCESSING OF <br />PROFILE SHALL BE ACCURATELY FITTED TO NEAT CLOSED JOINTS, FREE FROM <br />REQUIRED SO AS i0 INCLUDE ANCHOR STRAPS WITH DELIVERY OF TANK PACKAGE. <br />FINAL PAYMENT REQUEST, <br />OFFSETS ACROSS THE FINISH SURFACES AT THE JOINT. <br />Q <br />It <br />o� <br />Fw9 <br />O <br />RIOcc <br />0 <br />n <br />t <br />a a <br />d <br />¢ <br />z <br />LuH <br />z <br />0 <br />U <br />U <br />V) <br />j(C <br />C <br />Y J <br />r r <br />U <br />3 n <br />Z ti <br />C) <br />v <br />h O O <br />1 N <br />m <br />m Q <br />m Z <br />p <br />w <br />Q <br />J U w <br />K <br />z z <br />O <br />1 O <br />W y <br />N U <br />J <br />O <br />a <br />w <br />I n On <br />w <br />I, N� <br />a <br />r <br />O <br />v' <br />'o <br />w <br />z <br />` <br />m <br />m <br />Q <br />•- <br />DATE: 15JUL97 <br />PROJECT NO: <br />3027.20 <br />DRAWN: MSP <br />APPROVED: CL -- <br />DRAWING <br />FSP -1 <br />