Q
<br />It
<br />o�
<br />Fw9
<br />O
<br />---
<br />--- - _-----------------
<br />PERFORMANCE SPECIFICATION
<br />0
<br />n
<br />SECTION I GENERAL CONDITIONS
<br />SEC
<br />F
<br />> I O N i GENERAL CONDITIONS - CONTINUED�
<br />SECTION
<br />i GENERAL CONDITIONS - CONTINUED-
<br />-�_
<br />d
<br />__.
<br />¢
<br />z
<br />PART I
<br />-- GENERAL_
<br />PART 4
<br />- RESPONSIBILITY OF THE CON -TRACTOR - CONTINUED
<br />PART
<br />7 - COMPLETION OF CONTRACT - CONTINUED
<br />�LuPE OF WORK THE WORK INCLUDED IN THE CONTRACT FOR THIS PROJECINSPECTIONS.
<br />z
<br />CONTRACTOR SHALL BEREQUIRED TO ADHERE 10 LI. HE)18 MFN S OF
<br />0
<br />1 2 FIXED PARTS OR MEMBERS SHALL BE SEr EL FIGHT IN PLACE, FREE E FROM
<br />CONSISTS OF THE FURNISHING OFALIAE0k, MATERIALS, SERVICES, EOUIPMEN AND
<br />U
<br />OWNERS INSPECTION PROGRAM. CONTRACTOR SHALL COMPLY WITH REQUIREMENTS FOR
<br />DISTORTIONS.
<br />U
<br />V)
<br />APPLIANCES REOUIRED IN CONJUNCTION WITH OR PROPERLY INCIDENTAL TO THF COMPLETE
<br />NOTIF"ICATION, SITE PREPARATION REQUIREMENTS, COMPLIANCE, ON -SHE PRESENCE DURING
<br />�2.3
<br />j(C
<br />C
<br />Y J
<br />r r
<br />U
<br />3 n
<br />FINISHES SHALL BE FREE FROM BUBBLES, STREAKS, PEELING, PITS OR OTHER
<br />CONSTRUCTION OF A GASOLINE INSTALLATION FOR THE sOUrHLANU CORPORATION
<br />INSPECTION AND CORRECTION OF ANY DEFECTS OR RELATED PROBLEMS AS DIRECTED BY
<br />IRREGULARITIES. EXCEPT WHERE ROUGH MATERIALS MAY BE REQUIRED.
<br />v
<br />h O O
<br />1 N
<br />m
<br />m Q
<br />m Z
<br />p
<br />FINISH
<br />RT 2
<br />- AGREEMENT
<br />INSPECTING REPREDENHVF. CONTRACTOR SHALL. PROVIDE NO LESS THAN 48 HOURS NOTICE
<br />z z
<br />O
<br />SURFACES SHALL BE. FREE FROM DIRT GREASE, MASTICS, FI '
<br />EASE, NGERPRINTS, SCRATCHES.
<br />1 O
<br />W y
<br />N U
<br />J
<br />O
<br />a
<br />w
<br />I n On
<br />PRIOR TO INSPECTION
<br />I, N�
<br />a
<br />CONTRACTOR FARM SHALL. BE SOUTHLAND AGREEMENT"
<br />CORPORATION "GCATION.
<br />r
<br />DENTS. CRACKS, STAINS, CHIPS OR OTHER DAMAGING EFFECTS
<br />ArcC
<br />I
<br />(iA40015T. DATED tt/F38 AND RELATED INSURANCE SPECIFICATION. n COPY OF (EFTS CON-
<br />48
<br />COORDINATION: GASOLINE CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING AI_L PHASES
<br />7
<br />-.3
<br />rLF�1NING
<br />TRACT IS AVAILABLE THROUGH i_OCAI. CONSTRUCTION OFFICE OR SITE MANAGER FOR REVIEW
<br />_
<br />OF THE GASOLINE INSTALLATION WITH THE, GENERAL CONTRACTOR IN CHARGE OF THE
<br />7.3-i ALL WORK
<br />BUILDING OR MAJOR PORTION OF THE PROJECT THE BUILDING GENERAL CONTRACTOR AND
<br />SHALL BE CLEAN AND READY FOR USE UPON COMPLETION REMOVE
<br />PAGE ARTICLE II - OWNER WHENEVER THE WU2"J "OWNER" APPEARS IN TtC
<br />THE GASOLINE CONTRACTOR SHALL JOINTLY DEVELOP A MUTUALLY AGREEABLE SCHEDULE
<br />- TEMPORARY TAPES WRAPPING, CDATI NG, PAPER LABELS AND OfHER ITEMS
<br />S.
<br />CONTRACT DOCUMENTS. DRAWINGS AND SPECIFICATIONS, IT SHALL BE DEEMED TO READ
<br />O
<br />AND TIMETABLE FOR COMPLETION ON THE GASOLINE INSTALLATION. TIMETABLE FOR BUILDING
<br />732 CLEANING METHODS FOR PROPRIETARY MATERIALS SHALL BE IN STRICT ACCORDANCE
<br />'THE: SOUTHLAND CORPORATION."
<br />AND GASOLINE SHALL COINCIDE AND COMPLIMENT EACH OTHER SO THAT ONE DOES NOT
<br />WITH MANUFACTURER'S INSTRUCTIONS. CLEANING SOLUTIONS, AGENTS. SOLVENTS, WAXES
<br />2 3
<br />PAGE 3 -- ARTICLE III - CONTRACTOR WHENEVER THE WORD "CONTRACTOR" APPEARS
<br />DELAY THE OTHER
<br />OR OTHER MATERIALS SHALL BE ONLY AS APPROVED BY THE MANUFACTURER OF THE
<br />IN THE CONTRACT DOCUMENTS, DRAWINGS AND SPECIFICATIONS, IT SHALL BE DEEMED TO
<br />MATERIAL INSTALLED IN THE WORK.
<br />READ "GENERAL GASOLINE INSTALLATION CONTRACTOR '
<br />153 CLEAN-UP: CONTRACTOR SHALL CLEAN UP ALL DEBRIS CAUSED BY THE 'WORK OF
<br />SHOULD GASOLINE CONTRACTOR FAIL TO MEET DEADLINES AS ESTABLISHED BY THE
<br />PART 3
<br />--- INTENT OF DRAWING AND SPECIFICATIONS
<br />SCHEDULE AND/OR HOLD UP THE COMPLETION OF THE OVERALL BUILDING PROJECT,
<br />HIS SECTION, KEEPING THE PREMISES NEAT AT ALL TIMES.
<br />31
<br />THE INTENT OF THE DRAWINGS AND SPECIFICATIONS IS TO PRESCRIBE: A COMPLETE
<br />SOUTHLAND CORPORATION RESERVES THE RIGHT TO RECTIFY THE SITUATION ACCORDINGLY
<br />PART
<br />B - CODES
<br />WORK OR IMPROVEMENT WHICH THE CONTRACTOR UNDERTAKES f0 DO IN FULL COMPLIANCE
<br />49
<br />CONTRACTOR SHALL PROVIDE OWNER WRITTEN CERTIFICATION AS TO THE FOLLOWING:
<br />8 I
<br />THE FOLLOWING CODES ARE MADE A PART OF THIS SPECIFICATION SAID CODES SHALL
<br />WITH THE CONTRACT DOCUMENTS THE CONTRACTOR ;HALL DO ALL WORK. AS MAY BE
<br />4.7.1 CERTIFICATION FROM LOCAL/STATE GOVERNING AUTHORITIES AS APPLICABLE FOR
<br />DICTATE MINIMAL ACCEPTABLE STANDARDS. CODE SHALL BE ADHERED TO UNLESS LOCAL
<br />NECESSARY TO COMPLETE "THE WORK IN A SATiSFACIORY AND ACCEPTABLE MANNER
<br />CONTRACTOR CERTIFICATION/LICENSING FOR INSTALLATION OF GASOLINE STORAGE
<br />GOVERNING AUTHORITIES DICTATE HIGHER OR MORE STRINGENT REQUIREMENTS WHICH
<br />S2
<br />THE CONTRACTOR SHALL. UPON DISCOVERY, REPORT ANY DISCREPANCIES IN THE
<br />TANK SYSTEM
<br />SHALL TAKE PRECEDENCE:
<br />DRAWINGS AND SPECIFICATIONS TO THE OWNER'S CONSTRUCTION MANAGER.
<br />4.9.2 CERTIFICATION FROM EQUIPMENT MANUFACTURES AND SUPPLIERS (TANKS,
<br />8.1.1 NEPA .30 FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE
<br />5 S
<br />rHE DRAWINGS AND SPECIFICATINS ARE INTENDED TO HE COMPLIMENTARY ANYTHIN(,
<br />PRODUCT LINES, GTM'S, ETC.) AS TO ATTENDING AND ACHIEVING CERTIFICATION
<br />8.1.2 PEI MANUAL "RECOMMENDED PRACTICES FOR INSTALLATION OF UNDERGROUND
<br />MENTIONED IN THE SPECIFICATIONS AND NOT SHOWN ON THE ORWAINGS, OR SHOWN ON THE
<br />FROM APPROPRIATE COMPANY FOR INSTALLATION OF EQUIPMENT.
<br />LIQUID STORAGE SYSTEMS." (SRP -100-87 (OR LATEST EDITION)
<br />DRAWINGS AND NOT MENTIONED IN THE SPECIFICATIONS, SHALL BE OF LIKE EFFECT- AS IF
<br />`
<br />4,3 .3 CERTIFICATION ON APPROPR FORMAT AS TO INSTALLATION OF COMPLETE
<br />PART
<br />9 - WARRANTY / GUARANTEE
<br />SHOWN OR MENTIONED IN BOTH. GENERALLY, THE SPECIFICATIONS DESCRIBE WORK NHICH
<br />IN
<br />SYSTEM BEING PERFORMED N COMPLIANCE WITH ALL LOCAL, STATE AND FEDERAL_
<br />9.1
<br />EXCEPT WHERE SPECIAL GUARANTEES ARE REQUIRED M EXCESS OF ONE. (1) YEAR, ihFE
<br />Q
<br />CANNOT BE READILY IDENTIFIED ON THE DRAWINGS AND INDICATED TYPES, QUALITIES AND
<br />LAWS AND REGULATIONS
<br />CONTRACTOR AGREES TO REPAIR OR REPLACE: ANY DEFECT IN MATERIAL OR WORKMANSHIP
<br />METHODS OF INSTALLATION OF THE VARIOUS MATERIALS AND EQUIPMENT REQUIRED FOR
<br />(BEYOND ORDINARY WEAR AND TEAR) TO THE SATISFACTION OF THE OWNER'S CONSTRUCTION
<br />THE WORK IT IS NOT INTENDED TO MENTION EVERY ITEM OF WORK IN THE SPECIFICATIONS
<br />4.3.4 CERTIFICATION THAT ALL EQUIPMENT EITHER SUPPLIED BY OWNER OR CONTRACTOR
<br />HAS BEEN INSTALLED AS PER MANUFACTURER'S SPECIFICATIONS BY PERSONNEL.
<br />DATE: 15JUL97
<br />MANAGER FOR A PERIOD OF ONE (1) YEAR AFTER DATE OF ACCEPTANCE, WHETHER IN HIS
<br />WHICH CAN BE ADEQUATELY SHOWN ON THE DRAWINGS NOR SHOW ON THE DRAWINGS
<br />3027.20
<br />WORK OR IN THAT OF SUBCONTRACTOR'S, WITHOUT COST TO THE OWNER,
<br />DRAWN: MSP
<br />F
<br />ALL ITEMS OF WORK DESCRIBED OR REQUIRED BY THE SPECIFICATIONS EVEN IF THEY ARE
<br />TRAINED AND QUALIFIED FOR THAT SPECIFIC ITEM.
<br />APPROVED: CL --
<br />OF SUCH NATURE THAT THEY COULD HAVE BEEN SHOWN THEREON.
<br />4.10
<br />PAYMENT SHALL BE MADE PER ARTICLE 1113,2 OF THE CONTRACT
<br />PART
<br />10 - AS BUILT PLAN AND DOCUMENTATION
<br />4.11
<br />LIENS' CONTRACTOR SHALL PERMIT NO LIENS OF ANY KIND TO BE FIXED UPON OR
<br />10.1
<br />UPON COMPLETION OF PROJECT, CONTRACTOR SHALL PROVIDE "AS -BUILT SITE PLAN"
<br />AGAINST THE PROPERTY N BY ITSLABORE S, MECHANICS 0R MATERIALMEN, AND SHALL
<br />V Z FYONG FINAL LOCATION OF INCLUDING, BUT NOT LMI TED TO,
<br />ALL MATERIALS OR LABOR FOR WORK WHICH 15 sHow NON THE DRAWINGS OR IS
<br />INDEMNIFY, PROTECT AND SAVE OWNER HARMLESS FROM AND AGAINST ALL SUCH
<br />PLUMBING AND ELECTRICAL.
<br />INFERABLE AS BEING NECESSARY' TO PRODl1Cf. A FINISHED JOB SHALL BE
<br />PROVIDED THE CONTRACTOR WHETHER OR NOT THE WORK IS EXPRESSLY COVERED IN
<br />PROVIDED B
<br />CLAIMS AND LIENS.
<br />10.'2
<br />CONTRACTOR SHALL. KEEP PHOTOGRAPHIC JOURNAL OF ALL PHASES OF THE COMPLETE
<br />IC
<br />TUE SPECIFICATIONS
<br />4 12
<br />EQUIPMENT RESPONSIBILITY CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING,
<br />INSTALLATION. PHOTOGRAPHS ARE TO BE PROPERLY DATE[), IDENTIFIED AND FORWARDED
<br />RECEIVING, UNLOADING, HANDLING AND PROVIDING PROTECTED INSIDE STORAGE FOR ALL
<br />T ACONSTRUCTIONFFIf-
<br />0 LOCAL . OFFICE
<br />5a
<br />THE CONTRACTOR, SUBCONTRACTORS AND ALL TRADES SHALL EXAMINE THE SITE AND
<br />ASCERTAIN EXISTING CONDITIONS PRIOR TO THE START OF THEIR PORTIONS OF THE WORK.
<br />OWNER SUPPLIED EQUIPMENT AND MATERIAL. CONTRACTOR SHALL INSPECT EQUIPMENT UPON
<br />-THE
<br />SECTION
<br />II INSPECTIONS /TESTING
<br />RECEIPT AND IMMEDIATELY REPORT ANY DAMAGE DUE i0 SHIPPING TO OWNER'S
<br />BEFORE ORDERING MATERIALS OR DOING ANY WORK, THE CONTRACTOR SHALT. VERIFY AND
<br />_
<br />REPRESENTATIVE. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE DUE TO FAILURE
<br />BE RESPONSIBLE FOR THE CORRECTNESS OF ALL MEASUREMENTS AT THE SITE ANY
<br />DIFFERENCES 'WHICH MAY BE FOUND BETWEEN ACTUAL DIMENSIONS AND DIMENSIONS
<br />TO COMPLY WITH THESE REQUIREMENTS. DISPENSERS SHALL BE PROTECTED WITH SHIPPING
<br />PART
<br />1 - GENERAL
<br />INDICATED ON THE DRAWINGS OR SHOP DRAWINGS SHALT_ BE SUBMITTED TO THE OWNER'S
<br />BOXES UNTIL STORE IS TURNED OVER FOR OPENING CONTRACTOR SHALL BE SOLELY
<br />1.1
<br />SCOPE: THIS SECTION COVERS THE FURNISHING OF ALL LABOR, SERVICES
<br />RESPONSIBLE FOR ADEQUATE AND LOCKED STORAGE OF OWNERS MISCELLANEOUS
<br />AND
<br />CONSTRUCTION MANAGER FOR CONSIDERATION BEFORE PROCEEDING WITH THE ACTUAL
<br />EQUIPMENT AS REQUIRED TO PROVIDE INSPECTION SERVICES OF THE GAS INSTALLATION.
<br />DIMENSIONS AND MEASUREMENTS INDICATED ON THE DRAWINGS UNLESS A SUBSTANTIAL ERROR
<br />EQUIPMENT, TO INCLUDE GASOLINE CONSOLE, PRIOR TO OPENING OF THE STORE.
<br />HAS BEEN MADE. IF SUCH AN ERROR SHOULD OCCUR, IT 'SHALL BE BROUGHT TO THE
<br />4.13
<br />GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR FILING OF RECEIVING FORMS AND
<br />PART
<br />2 - INSPECTIONS
<br />ATTENTION OF THE O'WNER'S CONSTRUCTION MANAGER AND RE:SOLvED BEFORE PROCEEDING
<br />MISCELLANEOUS CONFIRMATION OF EQUIPMENT RECEIVING INFORMATION AS REQUIRED BY
<br />2.1
<br />INSPECTOR: INSPECTIONS / TESTS SHALL BE PERFORMED BY SOUTHLAND LOCAL.
<br />WITH WORK
<br />LOCAL. CONSTRUCTION OFFICE.
<br />CONSTRUCTION DEPARTMENT AND/OR APPOINTED REPRESENTATIVE.
<br />s `
<br />THE ORGANIZATION OF SPECIFICATIONS INTO DIVISIONS, SECTIONS AND PARAGPAPHS, AND
<br />4 t4
<br />GENERAL CONTRACTOR SHALL PROVIDE ALL PLUMBING, 'WIRING, MATERIAL AND LABOR AS
<br />2 2
<br />NOTIFICATION: CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING SOUTHLANWS
<br />THE ARRANGEMENT OF THE DRAWINGS ARE NOT INTENDED TO CONTROL THE CONTRACTOR
<br />REQUIRED TO INSTALL OWNER SUPPLIED EQUIPMENT- INCLUDE MONIES IN BID PROPOSAL
<br />CONSTRUCTION DEPARTMENT' 48 HOURS PRIOR TO REQUESTED INSPECTION
<br />IN DIVIDING THE WORK AMONG SUBCONTRACTORS OR IN THE ESTABLISHING THE EXTENT OF
<br />FOR INSTALLATION OF OWNER SUPPLIED EQUIPMENT UNLESS NOTED OTHERWISE.
<br />2.3
<br />SPILLAGE: SHOULD SPILLAGE OF PRODUCT OCCUR AT ANY PHASE OF INSTALLATION OR
<br />WORK TO HE PERFORMED BY ANY TRADE
<br />PART 5
<br />- PROTECTION
<br />TESTING, LOCAL SOUTHLAND CONSTRUCTION DEPARTMENT AND ENVIRONMENTAL DEPARTMENT
<br />DRAWINGS AND SPECIFICA(IONS DRAWINGS, INDICATE GENERAL. DESIGN AND ARRANGEMENTS
<br />5.1
<br />CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY LOSS OR DAMAGE CAUSED BY
<br />ARE TO BE NOTIFIED IMMEDIATELY, ESTIMATED LOSS OF PRODUCT AS WELL AS ACTION
<br />DRAWINGS ARE DIAGRAMMATIC AND ARE :NOT SCALED FOR DIMENSIONS TAKE ALL DIMENSIONS
<br />HIM OR HIS WORKMEN TO THE PROPERTY OR EQUIPMENT OF THE OWNER, OR TO THE WORK
<br />TAKEN IS TO BE NOTED AND RECORDED.
<br />FROM ARCHITECTUAL PLANS AND EQUIPMENT TO BE FURNISHED vERIFY DIMENSIONS IN THE
<br />OR MATERIALS OF OTHER CONTRACTORS. CONTRACTOR SHALL MAKE GOOD ANY LOSS.
<br />2.4
<br />REPRESENTATIVE: CONTRACTOR AND PLUMBING SUBCONTRACTOR SHALL BE AVAILABLE
<br />FIELD _
<br />DAMAGE OR INJURY WITHOUT COST TO OWNER FOR SUCH LOSS OR DAMAGE:.
<br />ON SITE DURING TESTING PROGRAMS. FAILURE TO COMPLY WITH THIS REQUIREMENT 'WILL
<br />PART 4
<br />- RESPONSIBILITY OF THE CONTRACTOR
<br />5.2
<br />CONTRACTOR SHALL PROVIDE AND MAINTAIN SUITABLE TEMPORARY SIDEWALKS, FENCES,
<br />RESULT IN ANY CONNECTIONS AND/OR REPAIRS AS REQUIRED BEING PERFORMED BY OWNER
<br />AS REQUIRED. COST OF SAID REPAIRS AND/OR CONNECTIONS SHALL BE DEDUCTED FROM
<br />4 '
<br />T
<br />('ONTRACTOR HEREBY DECLARES HE HAS READ ALL SPECIFICATIONS AND EXAMINED HE
<br />LIGHTS, SIGNS OR OTHER STRUCTURES AND DEVICES AS REQUIRED BY LAW, DO NOT
<br />CONTRACT AMOUNT AS REQUIRED r0 SATISFY THE SITUATION.
<br />DRAWINGS AND THAT HE UNDERSTANDS ALL CONDITIONS
<br />OBSTRUCT OR INTERFERE WITH TRAFFIC IN PUBLIC STREETS, ALLEYWAYS OR PRIVATE
<br />RIGHT --OF -WAYS. If WORK IS SUSPENDED, KEEP ALL ROADWAYS AND SIDEWALKS IN
<br />2.5
<br />PROHIBITED WORK: CONTRACTOR SHALL SCHEDULE `WORK SUCH THAT NO HEAVY
<br />4.2
<br />CONTRACTOR HEREBY DECLARES HE HAS VISITED THE SITE AND IS FIMILIAR WITH THE
<br />PROPER CONDITION AND PUT AND LEAVE THEM IN PROPER CONDITION AT TERMINATION OF
<br />EQUIPMENT IS OPERATING ON SlrE DURING INSPECTION PROGRAMS. NO WELDING OR OPEN
<br />CONDITIONS AFFECTING THE WORK. NO ALLOWANCE; SHALL. BE MADE SUBSEQUENTLY ON
<br />'WORK.
<br />FLAMES SHALL BE ALLOWED ON SITE AT ANY IIME DURING TEST PROCEDURES,
<br />BEHALF OF THE CONTRACTOR FOR ANY ERPOR NEGLIGENCE OIN HIS PART. IF IN THE
<br />5.3
<br />CONTRACTOR SHALL SEND PROPER NOTICES, MAKE NECESSARY ARRANGEMENTS AND PERFORM
<br />2.6
<br />INSTALLATION REPORTS. SHOULD SOUTHLAND OR THEIR APPOINTED REPRESENTATIVES BE
<br />PERFORMANCE OF THE CONTRACT, LATENT CONDITIONS AT THE SHE: ARE FOUND TO BE
<br />ALL WORK REQUIRED FOR THE CARE, PROTECTION AND MAINTENANCE OF PUBLIC UTILITIES
<br />UNA8LE TO BE PRESENT' AT SITE FOR PURPOSES OF FILING ANY INSPECTION REPORTS,
<br />MATERIALLY DIFFERENT FROM THOSE INDICATED BY THE DRAWINGS AND SPECIFICATIONS, OR
<br />ON AND AROUND THE BUILDING SITE, ASSUMING ALL RESPONSIBILTY AND PAYING ALL COSTS
<br />CONTRACTOR SHALT_ BE RESPONSIBLE FOR COMPLETE INSPECTION AND FILING OF REPORT
<br />UNKNOWN CONDITION; INHERENT IN WORK SHOWN AND
<br />TM
<br />FOR 'WHICH THE OWNER MAY BE LIABLE. CONTRACTOR HEREBY DECLARES HE HAS V RIFIED
<br />E
<br />WITH LOCAL CONSTRUCTION OFFICE, WRITTEN REPORT SHALL INCLUDE PHOTOGRAPHIC
<br />ONUOF THELLY
<br />TI MANCHAAGERSH
<br />SPECIFIED, THE ATTENTION OF THE. OWNER'S CONSTRUCTION MANAGER Sh1ALL. 8E CALLED
<br />THE LOCATIONS OF THE EXISTING UNDERGROUND UTILITIES ON SITE PRIOR TO THE START
<br />DOCUMENTATION OF ALL PROCEDURES.
<br />IMMEDIATELY i0 SUCH CONDITIONS BEFORE THEY ARE DISTURBED
<br />OF WORK. CONIFR HEREBY AGREES TO MAKE ARRANGEMENTS FOR AND TO PAY ALL CHARGES
<br />2.7
<br />TEST FAILURE: SHOULD SYSTEM FAIL ANY PORTION OF TEST PROGRAM, CONTRACTOR
<br />'1 z
<br />CONTRACTOR HEREBY DECLARES THAT HE HAS READ AND IS FAMILIAR WITH THE APPLICABLE
<br />IN CONJUNCTION WITH THE RELOCATIONS OF EXISTING UTILITIES AS REQUIRED. THE CONTRAC--
<br />SHALL IMMEDIATELY INSTIGATE PROCEDURES AS REQUIRED TO BRING SYSTEM INTO
<br />'TOILS REPORT,
<br />TOR SHALL BE RESPONSIBLE FOR ANY AND ALL UTILITY EASEMENTS, HOOK --UP CHARGES, TAP
<br />COMPLIANCE SHOULD FAILURE OF TEST DUE TO FACILITY WORK REQUIRE EXPENDITURE OF
<br />FEES AND SYSTEM DEVELOPMENT FEES AS NECESSARY FOR COMPLETION OF THIS PROJECT.
<br />ADDITIONAL MONIES FOR RESCHEDULING AND/OR RETESTING OF SYSTEM, CONTRACTOR
<br />CONTRACTOR SHALL- HE RESPONSIBLE FOR STRICTLY ADHERING f0 THE RECOMMENDATIONS
<br />5.4
<br />IF ALL OR PART OF THE WORK IS SUSPENDED FOR ANY REASON, CONTRACTOR SHALL
<br />SHALL BE HELD RESPONSIBLE FOR COMPENSATION ACCORDINGLY,
<br />OF SAID SOILS REPORT FOLLOWING ALL APPLICABLE PROCEDURES NOTED THEREIN. EXISTING
<br />PROPERLY COVER OVER, SECURE AND PROTECT ANY PORTION LIABLE TO SUSTAIN INJURY
<br />2.8
<br />CLEAN-UP: IN THE EVENT PRODUCT SPILLAGE SHOULD OCCUR DURING CONSTRUCTION
<br />WATER TABLE SHALL DETERMINE THE UTILIZATION OF TANK STRAPS AND TYPE OF BACKFILL..
<br />FROM ANY CAUSE
<br />OR DURING WARRANTY PERIOD DUE TO WORK PERFORMED BY CONTRACTOR, CONTRACTOR
<br />MATERIAL, SHOULD GROUND WATER OR CONTAMINATION BE DISCOVERED DURING TANK.
<br />5.5
<br />PRODUCT PROFECFION. CONTRACTOR SHALL PROVIDE ADEQUATE AND SECURE PROTECTION
<br />SHALL BE RESPONSIBLE FOR CLEAN-UP AS MAY BE REQUIRED.
<br />EXCAVATION, WORK SHALL BE SUSPENDED PENDING REVIEW BY LOCAL SOUTHLAND
<br />OF PRODUCT IN TANKS UPON DEUVERLY UNTIL TURNED OVER FOR OPERATION. ALL FILL,
<br />2.9
<br />TEST REPORT: UPON COMPLETION OF TESTING PROGRAMS, REPRESENTIVE OF TESTING/
<br />CONSTRUCTION REPRESENTATIVE
<br />VENT AND GAUGING CAPS AND/OR OPENINGS SHALL BE SECURED AND PADLOCKED TO
<br />INSPECTION COMPANY SHALL BE RESPONSIBLE FOR FILING COPIES OF TANK AND PIPING
<br />4 4
<br />CONTRACTOR SHALL REPORT ANY OBJECTION i0 MATERIALS, APPLIANCES, OR METHODS OF
<br />PREVENT VANDALISM OR THEFT.
<br />TEST/INSPECTION REPORTS WITH LOCAL SOUTHLAND CONSTRUCTION OFFICE OR SITE
<br />CONSTRUCTION SHOWN OR SPECIFIED TO THE OWNER'S CONSTRUCTION MANAGER AND OBTAIN
<br />PAR,( 6
<br />- SUBSTITUTION OF MATERIALS
<br />MANAGER WITH COPY TO JOB SITE.
<br />A DECISION BEFORE PROCEEDING
<br />PART
<br />3 - TANK INSTALLATION INSPECTION
<br />6.1
<br />MATERIALS AS .SPECIFIED REPRESENT REQUIRED STANDARDS. SUBSTITUTION MAY BE
<br />a 5
<br />PROPOSALS: CONTRACTOR SHALL SUBMIT E31p ON SOUTHIAND FORM -_
<br />PROPOSED IN WRITING WITH ADEQUATE SUPPORTING DATA FURNISHED. USE OF SUBSTITUE
<br />3.1
<br />SCHEDULE: CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING SCHEDULE SO
<br />"GASOLINE INSTALLATION BID AND
<br />MATERIALS IS DEPENDENT ON RECEIPT OF 'WRITTEN APPROVAL FROM OWNER'S APPROVED
<br />TANKS ARE TESTED AND SET IN TANK HOLE SAME DAY OF DELIVERY.
<br />ESTIMATE FORM " PROPOSALS SUBMITTED ON ANY OTHER FORM SHALL BE REJECTED AND
<br />REPRESENTATIVE,
<br />J.2
<br />EXCAVATION: ALL EXCAVATIONS SHALL BE COMPLETED WITH BEDDING MATERIAL IN
<br />RETURNED PROPOSALS PROPOSALS NOT COMPLETELY AND PROPERLY FILLED OUT SHALL BE
<br />PART 7
<br />- COMPLETION OF CONTRACT
<br />PLACE AND READY FOR INSTALLATION PRIOR TO TANK DELIVERY.
<br />REJECTED. PROPOSALS SHALL INCLUDE MONIES FOR REMOVAL OF ALL EXISTING
<br />IMPROVEMENTS AS REQUIRED FOR GASOLINE INSTALLATION.
<br />/.I
<br />THE CONTRACT SHALL BE CONSIDERED FULFILLED, SAVE AS PROVIDED IN ANY MAINTENANCE
<br />3.3
<br />ANCHORS: SHOULD ON-SITE CONDITIONS REQUIRE A WET HOLE TYPE_ INSTALLATION
<br />STIPULATIONS, BOND OR BY LAW, WHEN ALL THE 'WORK HAS BEEN COMPLETED WITH FINAL
<br />CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE PREPARATION OF CONCRETE
<br />•t6
<br />PERMSr CONTRACTOR BE RESPONSIBLE FOR APPLYING AND PAYING ALL
<br />APPLICABLE STATE AND LOCAL PERMITS AND APPLICATIONS AS RELATED r0 THIS WORK.
<br />INSPECTION AND ACCEPTANCE MADE BY ALL APPLICABLE GOVERNING BUILDING DEPARTMENTS.
<br />ANCHORS (DEADMAN) PRIOR TO SCHEDULING TANK DELIVERY.
<br />COPIES OF PERMITS AND CERTIFICATES SHALL BE FORWARDED TO LOCAL SOUTHLAND
<br />FIRE MARSHALLS OR OTHER JURISDICTIONS.
<br />3.4
<br />STRAPS: ON-SITE CONDITIONS REVEAL THE NEED FOR WET HOLE TYPE
<br />CONSTRUCTION OFFICE OR SITE MANAGER PRIOR TO COMMENCEMENT OF WORK. FINAL
<br />7.2
<br />WORKMANSHIP
<br />INSTALLATION, CONITRACTOR SHALL IMMEDIATELY NOTIFY TANK MANUFACTURER AND
<br />CERTIFICATION OF ACCEPTANCE BY GOVERNING AU THOT2I TIES SHALL ALSO BE ON FILE
<br />7.2.1
<br />SOUTHLAND CONSTRUCTION DEPARTMENT OF SITUATION. SAID NOTIFICATION WILL BE
<br />FRAME CORNERS AND JOINTS IN RUNNING MATERIALS OF THE SAME CROSS SECTION
<br />WITH LOCAL. CONSTRUCTION OFFICE OR SITE MANAGER PRIOR TO THE PROCESSING OF
<br />PROFILE SHALL BE ACCURATELY FITTED TO NEAT CLOSED JOINTS, FREE FROM
<br />REQUIRED SO AS i0 INCLUDE ANCHOR STRAPS WITH DELIVERY OF TANK PACKAGE.
<br />FINAL PAYMENT REQUEST,
<br />OFFSETS ACROSS THE FINISH SURFACES AT THE JOINT.
<br />Q
<br />It
<br />o�
<br />Fw9
<br />O
<br />RIOcc
<br />0
<br />n
<br />t
<br />a a
<br />d
<br />¢
<br />z
<br />LuH
<br />z
<br />0
<br />U
<br />U
<br />V)
<br />j(C
<br />C
<br />Y J
<br />r r
<br />U
<br />3 n
<br />Z ti
<br />C)
<br />v
<br />h O O
<br />1 N
<br />m
<br />m Q
<br />m Z
<br />p
<br />w
<br />Q
<br />J U w
<br />K
<br />z z
<br />O
<br />1 O
<br />W y
<br />N U
<br />J
<br />O
<br />a
<br />w
<br />I n On
<br />w
<br />I, N�
<br />a
<br />r
<br />O
<br />v'
<br />'o
<br />w
<br />z
<br />`
<br />m
<br />m
<br />Q
<br />•-
<br />DATE: 15JUL97
<br />PROJECT NO:
<br />3027.20
<br />DRAWN: MSP
<br />APPROVED: CL --
<br />DRAWING
<br />FSP -1
<br />
|