Laserfiche WebLink
UST Removal Work Plan <br />7 -Eleven Store No. 14117, Stockton, CA May 12, 1998 <br />• Upon receipt of analytical results, and approval from SJCEHD Inspector, backfill <br />and compact excavation in accordance with all appropriate local requirements. <br />• UST closure report outlining field activities, findings, and conclusions shall be <br />prepared by Fluor Daniel GTI (see Fluor Daniel GTI Work Plan). <br />4.0 LABORATORY ANALYSIS <br />Soil samples will be maintained, prepared and analyzed according to Test Methods for <br />Evaluatine Solid Waste, (SW -846), Third Edition, Update #2, November 1990. The <br />laboratory analyses will be performed by a laboratory that is certified by the California <br />Department of Health Services. <br />Soil sample collections and analysis to be conducted by Fluor Daniel GTI per SJCEHD <br />requirements (see Fluor Daniel GTI Work Plan). <br />5.0 REPORT <br />Upon completion of the field work and receipt of laboratory analyses, Fluor Daniel GTI <br />will prepare and submit a UST closure report per SJCEHD requirements (see Fluor <br />Daniel GTI Work Plan). <br />Maness appreciates the opportunity to provide environmental management services for <br />the Southland Corporation. If you have any questions regarding the work plan or require <br />additional information, please call us at (562) 595-4555. <br />ynrss-Cb�rporation <br />t�l.� 1 <br />Engineer <br />2 <br />