Laserfiche WebLink
LMr- Michael Kith <br />June 4, 1998 <br />` Gaou2 INC. Page 2 <br />e. Enclosed is a revised Page 5 of the Application for UST Closure Permit with the <br />new information for the registered soil hauler who will perform the work. <br />f. Enclosed is the completed Backfill Excavation Certificate. Maness will submit <br />the load tickets within 30 days of project completion. <br />3. Tank Removal: <br />a. Enclosed are 3 (three) copies of revised site specific plans. <br />b. The shoring requirements will be determined on site, see sheet FSP -2, Section III, <br />Part 3, Note 3.7. <br />C. Location of the monitoring panel is shown on Sheet SD -3. See Key Notes 13.10 <br />and 16.1. <br />d. The dispenser pan dimensions is shown on Sheet G-$. See Dispenser Sump <br />Frame. <br />If you have any questions or require additional information please feel free to contact me. <br />Sincerely, <br />RHL Design Group, Inc. <br />Debbie Herzog <br />Project Administrator <br />Enclosures <br />cc: Mr. Paul Parham, Southland Corporation <br />Mr. Bob DeNinno, Southland Corporation <br />F..\pMjcdNSaj&h*i0V.2=Mi-MK <br />BBLLEVUE. WA LA HABRA. CA SACRAMENTO, CA SCOTT$DALE. AZ' <br />