Laserfiche WebLink
7-00-1998 7 : 09AM <br />HL <br />GKOVP INC. <br />CHMS LAWTON <br />Regivna! Manager <br />AJseciatr <br />FROM RHL DESIGN GROUP 916 646 4679 P.1 <br />0 0 <br />/0-- r^' <br />ARCHiTECTVRB - ENG'-._�^-_-� <br />- C r. <•�nn�•►res*r� r C +en+•yroe <br />4550 HowrAvr.. Swift 504, Sacramento, C <br />July 2, 1998 <br />Pasi-ii' Fax Note x!_7671 ossa o� <br />To / ! f VWd V -h <br />GO./=, <br />Phone M d lob V0 <br />Fax tt C2M- �� - 3y33 1Fax# <br />J O A N W. J o u N s o N Michael Kith <br />Architect San Joaquin County Public Health Services <br />Co -President 304 East Weber Street, Third Floor <br />Stockton, CA 95201-0388 <br />BAIAN F- ZITA RE: <br />Architect <br />Go -Presiders! <br />Jour+ B. HICKS <br />Architecr <br />Vice President <br />Response to Plan Check. Comments for <br />Removaftstall UST's and Upgrade Equipment <br />Southland 7 -Eleven Store No. 14117 <br />2725 Country Club Boulevard <br />Stockton, California <br />RHL Job No. 3027.24 <br />Dear Mr. Kith: <br />- CaTiforla><s Ovelmgldt <br />(209) 468-3444 <br />1998 <br />JUL 0 <br />N eEE MMT SER�10ESL�H <br />On behalf of The Southland Corporation we are submitting this response to plan check <br />C g c t L R. 5 r B N C E R comments for permits to remove and install underground storage tanks and upgrade the <br />Archttecr equipment at the above referenced site_ The following is enclosed for your review and <br />Vice President <br />approval: <br />L Instadlauion <br />SRU'CE J. GREENFIELD <br />ManegingArekitert 1. The tank installation instruction manual is delivered to the installer under manifest when <br />Aslaciatc <br />the tank is delivered. Enclosed is a copy of the Installation instructions. <br />2. The automatic mechanical line leak detector is the Vaporless Manufacturing LD 2000 <br />JAMES e . 7 & a S T E N Seiies. There is two leak detector styles III the LD 2000 Series: the LD 2004E and the LD <br />RrgioIla ! Mand <br />Assasiaic 2000E-5 She LD 2000E -S will be install because with this model the pump shuts off if a <br />te <br />leak is detected. <br />3. Enclosed are three (3) copies of the revised Sheet G-5 showing the interstitial sensor at the <br />c A &Y N1. s a M L t N c end of the tank and a cut out section to show that the tank is double walled (polyethylene <br />Managing Arch-rect <br />Assonate jacket over interstitial standoff mesh over primer coated steel). <br />BLYYHg X. WILSON <br />Adanagint Architect <br />Assoeive <br />4. The probe to be installed in the tank sump is the Tidel 0301-0642-001. See enclosed <br />manufacture information. <br />BiLLLttYVE. WA LA HAEAA. CA PETALUMA. CA SeoTTSDALB. AZ <br />