Laserfiche WebLink
o - <br />STATEOFCAUFORNA <br />STATE WATER RESOURCES CONTROL BOARD <br />UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B <br />COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM <br />MARK ONLYJAI 1 NEW PERMIT ❑ <br />3 RENEWAL <br />PERMIT <br />5 CHANGE OF INFORMATION <br />7 PERMANENTLY CLOSED ONSITI <br />ONE ITEM �L-J-1 2 INTERIM PERMIT ❑ <br />4 AMENDEDERMIT <br />P <br />6 TEMPORARY TANK CLOSURE ❑ <br />8 TANK REMOVED O' <br />DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br />2_--Z5 <br />CDl)nmzy <br />B 57(y_j-<Jr)m <br />❑ 5 CONCRETE <br />1 AINK UtZA;KIY I WN COMPLETE ALL ITEMS -- SPECIFY IF UNKNOWN <br />A. OWNER'S TANK I.D.# ` B. MANUFACTURED BY: V <br />C. DATE INSTALLED (MO/DAYIYEAR) Ui< D. TANK CAPACITY IN GALLONS: <br />ILTANK NTENTS IFA -11S MARKED. COMPLETE ITEM C. <br />A. 1 MOTOR VEHICLE FUEL ❑ 4 OIL <br />B. <br />C• UNLEADED <br />❑ 3 DIESEL ❑ 6 AVIATIONGAS <br />2 PETROLEUM❑ 80 EMPTY <br />❑ <br />1 PflODUCT <br />1b PflEMIUM <br />❑ 4 GASAHOL <br />❑ 7 METHANOL <br />❑ 3 CHEMICALPRODUCT ❑ 95 UNKNOWN <br />❑ 2 WASTE <br />UNLEADED <br />2 LEADED <br />❑ 5 JETFUEL <br />❑ 4 STEELCLAD W/FIBERGLASS REINFORCED PLASTIC <br />MATERIAL <br />❑ 5 CONCRETE <br />❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br />D. IF (A.1) IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C. A. S. 0 <br />III. TANK CONSTRUCTION MARV nuC.TCu nul v lu onvCen o .V ImI nun Al r <br />A. TYPE OF�❑ <br />11 DOUBLE WALL <br />❑ 3 SINGLE WALL WITH EXTERIOR LINER <br />❑ 95 UNKNOWN <br />SYSTEM <br />U 2 SINGLE WALL <br />❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) <br />❑ 99 OTHER <br />S. TANK <br />1 BARE STEEL <br />F72 STAINLESS STEEL <br />❑ 3 FIBERGLASS <br />❑ 4 STEELCLAD W/FIBERGLASS REINFORCED PLASTIC <br />MATERIAL <br />❑ 5 CONCRETE <br />❑ 6 POLYVINYL CHLORIDE <br />❑ 7 ALUMINUM <br />❑ 8 100% METHANOL COMPATIBLE W/FRP <br />(PrlmaryTank) <br />❑ 9 BRONZE <br />❑ 10 GALVANIZED STEEL <br />❑ 95 UNKNOWN <br />❑ 99 OTHER <br />6 CONCRETE A U <br />❑ 1 RUBBER LINED❑ <br />2 ALKYD LINING <br />❑ 3 EPDXY LINING <br />E:]4 PHENOLIC LINING <br />C. INTERIOR <br />LINING <br />F-1 5 GLASS LINING <br />[2-6— <br />UNLINED <br />❑ 95 UNKNOWN99 <br />❑ OTHER <br />D. <br />IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? <br />YES_ NO— <br />DETECTOR [::]2 LINE TIGHTNESS TESTING ❑ 31 ERS L <br />D. CORROSION <br />❑ 1 POLYETHYLENE WRAP <br />❑ 2 COATING <br />❑ 3 VINYL WRAP <br />❑ 4 FIBERGLASS REINFORCED PLASTIC <br />PROTECTION <br />❑ 5 CATHODIC PROTECTION FT3141' NONE <br />❑ 95 UNKNOWN <br />❑ 99 OTHER <br />IV. PIPING INFORMATION CIROIF AIPe9nvFnonuunnoII nluncanonll,' R se,, .e,, <br />A. <br />SYSTEM TYPE A U <br />1 SUCTION <br />AaLb <br />PRESSURE A U <br />3 GRAVITY A U 99 OTHER <br />B. <br />CONSTRUCTION AU <br />1 SINGLE WALL <br />A U <br />2 DOUBLE WALL A U <br />3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br />C. <br />MATERIAL AND A141 <br />1 BARE STEEL <br />A U <br />2 STAINLESS STEEL A U <br />3 POLYVINYL CHLORIDE (PVC) A U <br />4 FIBERGLASS PIPE <br />CORROSION Ay <br />5 ALUMINUM <br />A U <br />6 CONCRETE A U <br />7 STEEL W/ COATING A U <br />8 100% METHANOL COMPATIBLE W/FRP <br />PROTECTION A <br />U 9GALVANIZED STEEL <br />A U <br />10 CATHODIC PROTECTION <br />A U 95 UNKNOWN p U <br />99 OTHER <br />D. <br />LEAK DETECTION <br />1 AUTOMATIC LINE LEAK <br />DETECTOR [::]2 LINE TIGHTNESS TESTING ❑ 31 ERS L <br />99 OTHER <br />❑ <br />MONBOgING <br />TA\IV 1 LAV P 11T MTI^Ikl <br />•. 1 nl\I� LCA\IA YL1 CV I IVIY <br />❑ 1 VISUAL CHECK 2 INVENTORY RECONCILIATION ❑ 3 VAPOR MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br />TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br />F <br />VI. TANK CLOSURE INFORMATION <br />1. ESTIMATED DATE LAST USED (MO/DAYNR) 2. ESTIMATED QUANTITY OF 3. WAS TANK FILLED WITH YES ❑ NO F7SUBSTANCE REMAINING GALLONS INERT MATERIAL] <br />THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY, AND TO THE BEST OF MY KNOWLEDGE. IS TRUE AND CORRFr.T <br />APPLICANTS NAME <br />(PRINTED A SIGNATURE) DATE <br />LOCAL AGENCY USE ONLY THE STATE I.D. NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br />COUNTY # JURISDICTION # FACILITY # TANK # <br />STATE LDA® = I -I - I <br />I �7Tz� T�I�rn <br />'ERMITNUMBER PERMIT APPROVED BY/DATE ��PERMMIT EXPIRATION �LDATE <br />_JL.1JJ <br />FORM B (9.90) I MI5 VUHM MUST Be ACCOMPANIED BY A PERMR APPUCATION • FORMA, UNLESS A CURRENT FORMA HAS BEEN FILED. <br />FOROaifBR4 <br />1 <br />