Laserfiche WebLink
e <br /> Onitoring System Certification <br /> Site Address 2725 COUNTRY CLUB BLVD Date of Testing/Service: 03124/2010 <br /> D. Results of Testing/Servicing <br /> Software Version Installed: 327.04 <br /> Complete the following checklist: <br /> El Yes No' Is the audible alarm operational? <br /> ® Yes ❑No' Is the visual alarm operational? <br /> ® Yes No` Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not <br /> X❑ Yes El No' interfere with their proper operation? <br /> X Yes No' NIA If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> ❑X Yes ❑No• ❑NIA monitoring system detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive <br /> shut-down?(check all that apply) ® Sump/Trench Sensors; 0 Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks aad sensor fail ureldisconnection? ❑X Yes ❑No <br /> No" NIA For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.:no mechanical <br /> E Yes ® <br /> overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank fill points(s)and operating <br /> properly? If so,at what percent of tank capacity does the alarm trigger? 90 <br /> ❑ Yes' Q No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> X❑No Was liquid found inside any secondary containment systems designed as dry systems?(check all that apply) E]Product; <br /> L1 Yes' <br /> ❑ Water. If yes,describe causes in Section E,below. <br /> Q Yes ❑No Was monitoring system set-up reviewed to ensure proper settings?Attach set-up reports,if applicable. <br /> Q ves ❑No Is all monitoring equipment operational per manufacturers'specifications? <br /> In Section E below,describe haw and when these deficiences were or will be corrected. <br /> E. Comments: <br /> Page 2 of 3 Based on CA form dated 03108 <br />