Laserfiche WebLink
b//ly/2tlU1 12:Y3 2093651543 TAtlKNOLOG/ PGGE 05 <br /> INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br /> TEST DATE.07/17/01 8900 SHOAL CREEK,BUILDING 200 WORK ORDER NUMBER2217799 <br /> CLIENT:SAFEWAY INC. AUSTIN,TEXAS 78757(512)451-6334 SITE:SAFKKAY INC.. <br /> t Y r <br /> Tank ID: i0E 3 Tank manlfolded: No Bottom to top fill in inches: 187.0 <br /> Product: PREMIUM Vent manlfolded: YEN Bottom to grade in inches: 197.0 <br /> Capacity in gallons: 10,037 Vapor recovery manifolded. YES Fill pipe length in inches: 63.0 <br /> Diameter in inches: 120.00 Overfill protection: YES Fill pipe diameter in inches: 4.0 <br /> Length in inches: 207 Overspill protection: YES Stage I vapor recovery: DUAL <br /> Material: FRP CLD ST Installed: AT43 Stage 11 vapor recovery: ASSIST <br /> CP installed on: / / <br /> COMMENTS <br /> xT3i,4e}9t' •, <br /> Stan(in) End(In) <br /> Dipped Water Level: 0.00 0.00 Nowipassed Fallsd/replaeed New/paesad Failed/replaced <br /> Dipped Product Level: 58.00 5111.00 L.D.01 LO.i/ L.D.a2 L.D.02 <br /> Probe Water Level: 0.000 0.000 Make: YESDSRROOT <br /> Ingress Detected: Water N Sr,btle N uuageN Model: L.L.D. <br /> Test time. 12:29-14t17 SIN: <br /> Inclinometer reading: 0.00 Open time in sec: <br /> Holding psi: 3v <br /> VacuTect Tesl Type: Multiple tanks NOT <br /> Resiliency a: <br /> VacuTect Probe Entry Point: Fill Test leak rate mVm: 109.0 TESTED <br /> Pressure Set Point: -0.50 Metering psi: <br /> Tank water level in inches: 0.00 Calib. leak in gph: 3.00 <br /> Water table depth in inches: Results: PASS <br /> Delermined by(method): <br /> Result- PASS <br /> COMMENTS <br /> COMMENTS <br /> TAs ARS D/W MITN DRY xlwrtl 1Re <br /> 77 LINE ,�, f ,,. e:, t 1 <br /> Material. FLEX FLEX <br /> Diameter(in): 1.5 1.3 <br /> Length(tt): 90.0 90.0 <br /> Test psi: 50 s0 <br /> Bleedback cc: 0 0 <br /> Test time (min): 40 40 Not NOT <br /> Start time: 12,30 12130 TESTLD TEBTED <br /> End time: 13130 13130 <br /> Final gph: -0.006 -0.006 <br /> Resull: PASS PASS <br /> Pump type: I'Mas IRE PRESSURE <br /> Pump make: iR Pa"C' FE PETRO <br /> COMMENTS Impact Valves Operational: YES <br /> Printed 07/19/2001 12:14 <br /> m I KIOSK W <br /> w <br /> PLUS DREM 1 <br /> I REG STP I ® STP ® STP <br /> Y <br />