Laserfiche WebLink
Gl'LC-4441 1V•V1rP1 rnV�� <br /> 1 <br /> Piping (cross-sectional d%W am. including connections to tank and dispen,.Oo). <br /> i <br /> (0.) Vent and tank riser primary containment system equipped with overfill prevention system that: <br /> Restricts delivery of flow to tank (Section 2635 (b) (2) (B) or (C)), or <br /> ! R Provide positive shut off of flow to the tank at no more than 95 X (Section 2635 (b)(2)(q), or <br /> !(a) X vapor recovery piping designed so it cannot contain liquid phase product, or <br /> i (C) Suction piping (below grade piping operates at less than atmospheric pressure) [Section 2636 (a) (3)1 <br /> Sloped so contents of the pipe will drain back into the storage tank If the suction is <br /> released. <br /> No valves or pumps installed below grade. <br /> inspection method provided to demonstrate compliance with section 2636 (a) (3). <br /> (D) LVA Corrodible underground piping protected against corrosion (Section 2636 (b)). <br /> (E) underground primary piping will meet all of the following requlrements <br /> X Primary piping in contact with hazardous substance under normal operation conditions shall be: <br /> installed inside a secondary containment system in the form of: X secondary pipe_Vau(i or <br /> _tined trench to be sloped to a collection sump at the lou point of the piping_ <br /> ,X Primary piping and secondary containment systems will be installed in accordance with industry <br /> code of practice and voluntary consensus standards— <br /> Li tied trench used as secondary containment <br /> material compatible with the substance scored. <br /> Covered and capable of supporting any expected vehicular traffic. <br /> i(F) Underground piping with secondary containment will be equipped and monitored as follows: <br /> 1i X Secondary containment will be equipped with a continuous monitoring system connected to an audible <br /> and visual alarm system. <br /> X Automatic line leak detectors will be installed on pressurized piping <br /> Manufacturer: VPF..DP..R RQM Model: PLT.O & 784380-352 <br /> { g_ Annual monitoring wilt be conducted on the pressurized piping with secondary containment. <br /> X Annval line tightness test will not be required if the continuous monitor shuts down the pump and <br /> activates the alarm system when a release is detected and when the continuous monitoring system <br /> fails or is disconnected. <br /> 2q. X State water Resources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br /> ) <br /> 21j, X Plan review and operating permit fees paid. <br /> 2 what is the approximate depth to ground water: 9_5t t-0 13_51 _ <br /> (include source of information - borehole logs, monitoring well data, water <br /> studies, etc.) SOILS REPORT SEE NOTE ON TKL-1 <br /> ii <br /> Total nurober of ranks on site after installation: 3 <br /> 240. County/City Fire District and Building Department notified. <br /> 25. N/A in the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br /> j responsibility [in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br /> Requirements] as an owner or operator to submit a workplan to PRS-END Site Mitigation Unit prior to initiating any <br /> assessment or remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br /> The owner or operator must acknowledge this responsibility for workplan submittal by signature and date below. <br /> Neme Title Date <br /> COWD[TIONS OF APPROVAL: <br /> , <br />