My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1313
>
2300 - Underground Storage Tank Program
>
PR0231049
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:24 AM
Creation date
11/2/2018 7:03:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231049
PE
2381
FACILITY_ID
FA0003765
FACILITY_NAME
AIRPORT SHELL*
STREET_NUMBER
1313
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15137007
CURRENT_STATUS
02
SITE_LOCATION
1313 E CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\C\CHARTER\1313\PR0231049\COMPLIANCE INFO 1986 - 2008.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r- <br /> QUARTERLf INVENTORY Rc 'l <br /> Facility Name: 41 -g eHV2l�-1*f�'/ Tank # Size VFW <br /> c <br /> Facility Address: X313 ell " T 12.., l� <br /> City: _-"TPz<re�?j 1"S2as <br /> County: _�4 1h=Lf/ A) <br /> State: r4td rt AJI fL <br /> Waste Oil <br /> These were inventory variations that I hereby certify that all product level variations <br /> ❑ exceeded the allowable limits for this ❑ for the above mentioned facility were <br /> quarter. within allowable limits for this quarter. <br /> LIST DATE, TANK#AND AMOUNT FOR ALL VARIATIONS OUT OF TOLERANCE <br /> THAT EXCEED THE ALLOWABLE LIMITS. INVESTIGATIVE STEPS <br /> Date Tank # Amount Explanation Step 1 Review Records .Step <br /> Step 2 New reconciliation <br /> performed. <br /> Step 3 Shell Oil notified. <br /> Step 4 Records review from <br /> the last stable <br /> situation. <br /> Step 5 Physical facilities <br /> inspected for leaks. <br /> Step 6 Dispenser meters <br /> calibrated. <br /> Step 7 Piping hydrostatically <br /> tested. <br /> Step 8 Underground storage <br /> tanks precision tested. <br /> Step 9 Additional investigation <br /> as required by Shell <br /> or the local agency. <br /> This quarterly summary report <br /> - shall be submitted within 15 days . <br /> after the end of each quarter. Check <br /> the uarter you are submitting <br /> IBJ Quarter 1 — January thru March <br /> Submit by April 15 <br /> ❑ Quarter 2 — April thru June <br /> Submit by July 15 <br /> ❑ Quarter 3— July thru September <br /> Submit by October 15 <br /> ❑ Quarter 4— October thru December <br /> Submit by January 15 <br /> Send to (Local Agency):4<,,P,,y r,14/ -- <br /> P in <br /> KEFP COPIES OF THIS FORM FOR YOUR RECORDS <br /> DEALER SIGNATURE DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.