My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1313
>
2300 - Underground Storage Tank Program
>
PR0231049
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:24 AM
Creation date
11/2/2018 7:03:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231049
PE
2381
FACILITY_ID
FA0003765
FACILITY_NAME
AIRPORT SHELL*
STREET_NUMBER
1313
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15137007
CURRENT_STATUS
02
SITE_LOCATION
1313 E CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\C\CHARTER\1313\PR0231049\COMPLIANCE INFO 1986 - 2008.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A KNOLOG <br /> TECHNOLOGY FOR TANKS LINE TEST LOG S.O.# <br /> AND THEIR ENVIRONMENT <br /> Customer Date <br /> IITank No. f Line No. /A9 Product I <br /> 1lPiping Material S4Test Pressure psi Calib.Multiplier 005/! <br /> .i <br /> 11COMPRESSION Zero Pres.Level -� 3, b Test Pres.Level PSR-, Z <br /> NEST LEVELA Volume A ^, o <br /> LINE TEST <br /> Mii.Time !Reading N Level LevelA I VolumeA 1 ,Projected G.P.H. A <br /> Start / Z1iiii4all�l ---- <br /> F)5;--'lD I I <br /> Da 3 <br /> 4 <br /> 6 <br /> FINAL LINE TIGHTNESS RATE: Z> , FAIL [ ] or PASS [� ] <br /> I Comments <br /> I <br /> (Tank No. Line No. Product <br /> Piping Material Test Pressure psi Calib.Multiplier <br /> ICOMPRESSIO Zero Pres.Level Test Pres.Level i <br /> IITEST LEVELA Volume A <br /> LINE TEST <br /> Mi1.Time Reading i Level LevelA VolumeA Projected G.P.H. A <br /> Start <br /> it 1 i i <br /> 2 <br /> 3 <br /> 4 <br /> 5 <br /> 6 <br /> FINAL LINE TIGHTNESS RATE: , FAIL [ ] or PASS [ ] <br /> Comments: <br /> FORM No.: LineTmtLos-1/99 <br /> TANKNOLOGY CORPORATION INTERNATIONAL <br /> 5225 Hollister St. • Houston,TX 77040-6294 • (713)690-8265 • 1 (800)888-8563 • Fax: (713)690.2255 <br />
The URL can be used to link to this page
Your browser does not support the video tag.