My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2011 - 2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1442
>
2300 - Underground Storage Tank Program
>
PR0518458
>
COMPLIANCE INFO 2011 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2022 11:14:22 AM
Creation date
11/2/2018 7:18:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011 - 2016
RECORD_ID
PR0518458
PE
2361
FACILITY_ID
FA0013918
FACILITY_NAME
CHEVRON STATION #210997*
STREET_NUMBER
1442
STREET_NAME
COLONY
STREET_TYPE
Dr
City
RIPON
Zip
95336
APN
26102028
CURRENT_STATUS
01
SITE_LOCATION
1442 Colony Dr
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\C\COLONY\1442\PR0518458\COMPLIANCE INFO 2011 - 2016.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In -Tank Gauging / SIR Equipment: F Check this box if tank gauging is used only for inventory control. <br />r Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />io Yes <br />r No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />t+ Yes <br />r No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />!: Yes <br />r No* <br />Was accuracy of system product level readings tested? <br />r Yes <br />r No* <br />Was accuracy of system water level readings tested? <br />l+ Yes <br />(_ No* <br />lWere all probes reinstalled properly? <br />r* Yes <br />r No* <br />ere all items on the equipment manufacturer?s maintenance checklist completed? <br />* In the Section H, below, describe how and when these defdenci s were or will be corrected. <br />G. Line Leak Detectors (LLD): Check this box if LLDs are not installed. <br />Complete the following checklist: <br />Yes <br />C No* <br />For equipment start-up or annual equipment certificationf was a leak simulated to verify LLD performance? (Check all that <br />r N/A <br />apply) simulated leak rate: rV_ 3 g.p,h,; r— 0.1 g.p.h; L 0.2 g.p.h. <br />�+ Yes <br />(_ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />ft Yes <br />r No* <br />Was the testing apparatus properly calibrated? <br />r Yes <br />(_ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />N/A <br />C: Yes <br />r No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />r N/A <br />i* Yes <br />r No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />r N/A <br />f+ Yes <br />r No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />F- N/A <br />G- Yes <br />f ` No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />r N/A <br />Yes <br />r No* <br />ere all items on the equipment manufacturers maintenance checklist completed? <br />* Ire the Section H, below, describe how and when these deficiencies were or will be corrected. <br />W. rnmmantc <br />Page 3 of 3 12/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.