Laserfiche WebLink
0 0 <br />D. Results of Testing/Servicing <br />Software Version Installed: 327.04 <br />Complete the following checklist: <br />• Yes <br />r No* <br />Is the audible alarm operational? <br />Yes <br />r No* <br />Is the visual alarm operational? <br />170 Yes <br />C No* <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />• Yes <br />C No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with <br />heir proper operation ? eration? <br />+ Yes <br />r No* <br />f alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? <br />N/A <br />o Yes <br />f No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring <br />C <br />system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shut -down? (Check <br />N/A <br />all that app/yF,Sump/Trench sensors; r Dispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnections Yes; r No <br />r Yes <br />r No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no mechanical overfill <br />prevention valve is installed), is the overfill warning alarm visible and audible at the tank fill point(s) and operating properly? If <br />G N/A <br />so, at what percent of tank ca aci does the alarm trigger? % <br />f� Yes* <br />No <br />W25 any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the <br />manufacturer name and mode3 for all re Iacement parts in Section E below. <br />C~ Yes* <br />No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Cheek all that apply) <br />_i Product; r Water. If yes, describe causes in Section E below. <br />f+ Yes <br />r No* <br />as monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />Yes <br />r No* <br />s all monitoring equipment operational per manufacturer's specifications? <br />* In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. Comments: <br />v. r. battery replaced. syphon jet valve replaced. all passed, <br />Monitoring System Certification Page 2 of 3 <br />12/07 <br />RECEI EL <br />MAR 2015 <br />ENVIRONMENTAL <br />1}r-VrU r51=174nTM710 . <br />