Laserfiche WebLink
* S WRCB January,2002 Page of <br /> 9. SPELL/OVERFILL CONTAINMENT BOXES Job#: T7029132 <br /> Facility-is Not Equipped With Spill/(h-erfill Contaituneut Boxes 0 <br /> SpUl/Ohve&U Containment Boxes are Present.but were Not Tested p <br /> Test Method Developed By: gp Spill Bucket Manufacturer © Indust-n-Standard UMProfessional Engineer <br /> p❑Other(8peci, )) <br /> Test Method Used: g Pressure p❑ Vactmm RHydrostatic <br /> Other(,Ypecifw <br /> Test Equipment Used: Inceon TS-STS Equipment Resolution: +-0.002„ <br /> Spill Box A 1 Spill Box# Spill Box# Shrill Bos# <br /> Bucket Diameter: 4" <br /> Bucket Depth: (i <br /> Wait time between applying <br /> pressureh-acuumAvater and 15 min <br /> starting test: <br /> Test Start Time: 10:29am 110:50am <br /> Initial Reading(RI): — 2.859812.8597 <br /> Test End Time: 10:44Am 111:05am <br /> Final Reading(RI.): 2.8597 12.8598 <br /> Test Duration: 15 min l 15 min <br /> Change in Reading(RF-RI): -0.001 /-0.0001 <br /> Pass/Fail Threshold or <br /> Criteria: +-0-002"l+-0.002„ <br /> Test Result: N Pass ❑Fail ❑Pass []Fail ©Pass ❑Fail ❑Pass ❑Fail <br /> Comments a Onclude jq oramtion on repairs madeprior to testing, and recortzrrreiidc,(l,fi)lloir-ar ,for.1triled tests) <br />