Laserfiche WebLink
a. In-Tank Gauging / SIR Equipment: inventory control. <br /> Equipment.®Check this box if tank gauging is used and for <br /> ❑Check this box if no tank gauging or SIR equipment is installed. <br /> must be completed if in tank gauging equipment is used to perform leak detection monitoring <br /> or round faults? <br /> This section m and termination, including testing g <br /> g Yes ❑No* Has all input wiring been inspected for proper entry and residue buildup? <br /> ®yeS O No* ere all tank-gauging probes visually inspected for damage <br /> Yes <br /> ❑No Was accuracy of system product level readings tested? <br /> Yes ❑N o* Was accuracy of system water level readings tested? <br /> Yes C3 No* Were all probes reinstalled properly? <br /> Were all items on the equipment manufacturer's maintenance checklist completed <br /> Yes ❑No# <br /> : �Check this box..if Leak Detectors are not installed. <br /> G.Line Leak Detectors (LLD ' <br /> Complete the fallowing checklist: � 2 GPH, ❑0 "I GPH <br /> ui ment start-up or annual equient certification ❑aleak simulated to verify LLD performance? <br /> ❑Yes ❑N 1 For eq pm <br /> P <br /> [IN o* (Check all that apply)Simulated leak rate: 3.0 m <br /> re uireents? <br /> ❑yes C1No* Were all LLDs confirmed operational and accurate within regulatory q <br /> ❑Yes ❑No* Was the testing apparatus properly calibrated? <br /> ❑Yes ❑-N 1A For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ❑No* <br /> s a leak? <br /> 13 yes LJ N"" For electronic LLDs, does the te monitoring system is disabled <br /> El No* automatically <br /> urbine automatically shut off if the LLD on o tth <br /> ❑Yes ❑N/A For electronic LLDs,does the turbine shut off i#any p° s stem malfunctions or fails a <br /> ❑N o* or disconnected? portion of the monitoring y <br /> ❑Yes ❑NIA For electronic LLDs, does the turbine automatically shut off if any <br /> ONO* est? <br /> ❑ CINIA For electronic LLDs,have all accessible wiring connections been visually inspects <br /> Yes <br /> ❑No* ent manufacturer's maintenance checklist completed? <br /> ❑Yes ❑No* Were all items on the equipm <br /> * In section H below,describe how and when these deficiencies were or will be corrected: <br /> H.Comments: — —— -- <br /> 3101 <br /> page 3 of 3 <br /> Monitoring System Certification <br />