Laserfiche WebLink
Cal.Code Regs,Title 23,Division 3,Chapter 16,Underground Tank Regulations <br /> inspection shall include,but is not limited to,the following: <br /> he permit or (1) Reviewing the alarm history report or log for the previous month, and checking that each alarm condition was <br /> and submit a documented and responded to appropriately.A copy of the alarm history report or log,along with documentation describing <br /> mited to: action taken in response to any alarm(s),shall be attached to the monthly visual inspection record. <br /> (2)Inspecting for the presence of hazardous substance,water,or debris in spill containers. <br /> (3)Inspecting for the presence of hazardous substance,water,or debris in under-dispenser containment areas,and checking <br /> that the monitoring equipment in these areas is located in the proper position to detect a leak at the earliest possible <br /> opportunity. <br /> and case law (q)Inspecting for the presence of hazardous substance,water,or debris in containment sumps that, in the past month,have <br /> had an alarm-for which there is no record of a service vi it, and checking that the monitoring equipmen W—drese <br /> containment sumps is <br /> -locate the proper in position to detect a leak at the earliest possible opportunity. <br /> ;ency"for the <br /> �e given trade (5)Checking that all required testing and maintenance for the underground storage tank system have been completed, and <br /> documenting the dates these actives occurreef— <br /> the applicant <br /> 3urt within 10 (6)Verifying that all facility employees have been trained in accordance with subdivision 2715(f). <br /> (d)The designated UST operator(s)shall provide the owner or operator with a copy of each monthly inspection report,and alert <br /> trade secrecy the owner or operator of any condition discovered during the monthly visual inspection that may require follow-up actions. <br /> the additional <br /> "trade secrets" (e)The owner or operator shall maintain a copy of the monthly inspection record and all attachments for the previous twelve <br /> its decision.If months.The records shall be maintained on-site or,if approved by the local agency,off-site at a readily available location. <br /> section. <br /> (f)By July 1,2005,and every twelve months thereafter,the designated LIST operator(s)shall train facility employees for which <br /> I in subsection he or she is responsible in the proper operation and maintenance of the underground storage tank system.For facility employees <br /> hired on or after July 1,2005,the initial training shall be conducted within 30 days of the date of hire. <br /> Y should exist, (1)The training for facility employees must include,but is not limited to: <br /> fidential file,a <br /> (A)The operation of the underground storage tank system in a manner consistent with the facility's best management <br /> practices. <br /> licant or other <br /> iafety Code or (B)The facility employee's role with regard to the monitoring equipment as specified in the facility's monitoring plan. <br /> (C)The facility employee's role with regard to spills and overfills as specified in the facility's response plan. <br /> rr provisions of <br /> ()a)The name of the contact person(s)for emergencies and monitoring equipment alarms. <br /> (2)At least one of the facility employees present during operating hours shall have current training in accordance with <br /> subdivision (f)(1). For facilities that are not routinely staffed, the designated UST operator shall implement a facility <br /> employee training program approved by the local agency. <br /> -s, Operators, (3)A list of facility employees who have been trained by the designated UST operator(s),shall be maintained on-site or off- <br /> site at a readily available location, if approved by the local agency. The list shall be provided to the local agency upon <br /> request.The list shall include the_dates for all facility employees and the hiring dates for all facility employees <br /> e local agency hired on or after July 1,2005. <br /> uirements, and <br /> .any change of (g)Any person(s) installing underground storage tank systems or components shall be certified or licensed by the Contractors <br /> State License Board. <br /> rnational Code (h)Any individual(s) installing underground storage tank system components shall meet the following requirements, or work <br /> renew the ICC under the direct and personal supervision of an individual physically present at the work site who meets the following <br /> requirements: <br /> ,tcros for which (1)The individual has been adequately trained as evidenced by a certificate of training issued by the manufacturer(s)of the <br /> monthly visual underground storage tank system components.On and after July 1,2001,this certification shall be renewed by completion <br /> 61 <br />