Laserfiche WebLink
SWRCB.January 2002 Page of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spilli0verfill Containment Boxes are Present_ but were Not Tested ❑ <br /> Test Method Developed By: E Spill Bucket Manufacturer ❑Industry Standard x Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure Q Vacuum x Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: .TS-STS icon stunp test System Equipment Resolution: 2.]t)1 <br /> Spill Sox# Diesel Spill Boy# ; spill Box# Spill Box# <br /> Bucket Diameter: m 12" - <br /> Bucket Depth: 12" <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Min 15 Min 15 Min 15 Min. <br /> starting test: <br /> Test Start Time. 13:3.1 11113/03 <br /> Initial Reading(Rt): 3.7633 <br /> Test End Time: 13:49 <br /> Final Reading(RF).- 3.7938 <br /> Test Duration: 15 Min 15 Min 15 Min 15 Min <br /> Change in Reading(RF-R), .0015 <br /> Pass/Fail Threshold or .002 .002 .002 .002 <br /> Criteria: <br /> Test Result: ■ Pass ❑Fail ❑ Pass 0 Fail ❑ Pass Q Fail ❑ Pass ❑Fail <br /> Comments— linclude infornaarion ora repairs made prior to testing, and reconanaeaaded fblloii!-:tp,fbr failed tests) <br />